Selection of Rational Scheme for Inspection of Overhead Power Transmission Lines with 35 kV Voltage and Higher
The paper considers four variants of inspection of overhead power transmission lines with 35 kV voltage and higher. Technical and economic indices for every inspection variant have been determined in the paper. The most rational inspection variant of the line having length up to 30 km is a scheme of...
Main Authors: | , |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2012-04-01
|
Series: | Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika |
Online Access: | https://energy.bntu.by/jour/article/view/223 |
_version_ | 1797879819320426496 |
---|---|
author | R. G. Voytko M. A. Korotkevich |
author_facet | R. G. Voytko M. A. Korotkevich |
author_sort | R. G. Voytko |
collection | DOAJ |
description | The paper considers four variants of inspection of overhead power transmission lines with 35 kV voltage and higher. Technical and economic indices for every inspection variant have been determined in the paper. The most rational inspection variant of the line having length up to 30 km is a scheme of line inspection by team of electricians within one day. Execution of overhead power transmission line inspection by one person being sent on an assignment trip is expedient when the line length is more than 30 km. In the case of inspection criteria equivalence (minimum cash expenditures on inspection, minimum inspection duration, maximum quality of work execution) a scheme presupposing to use a helicopter with a scanning device is considered as the most rational one. |
first_indexed | 2024-04-10T02:54:50Z |
format | Article |
id | doaj.art-8820baa9c8d94172abfcaaf86f4486e6 |
institution | Directory Open Access Journal |
issn | 1029-7448 2414-0341 |
language | Russian |
last_indexed | 2024-04-10T02:54:50Z |
publishDate | 2012-04-01 |
publisher | Belarusian National Technical University |
record_format | Article |
series | Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika |
spelling | doaj.art-8820baa9c8d94172abfcaaf86f4486e62023-03-13T07:41:47ZrusBelarusian National Technical UniversityIzvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika1029-74482414-03412012-04-0102510217Selection of Rational Scheme for Inspection of Overhead Power Transmission Lines with 35 kV Voltage and HigherR. G. Voytko0M. A. Korotkevich1Белорусский национальный технический университетБелорусский национальный технический университетThe paper considers four variants of inspection of overhead power transmission lines with 35 kV voltage and higher. Technical and economic indices for every inspection variant have been determined in the paper. The most rational inspection variant of the line having length up to 30 km is a scheme of line inspection by team of electricians within one day. Execution of overhead power transmission line inspection by one person being sent on an assignment trip is expedient when the line length is more than 30 km. In the case of inspection criteria equivalence (minimum cash expenditures on inspection, minimum inspection duration, maximum quality of work execution) a scheme presupposing to use a helicopter with a scanning device is considered as the most rational one.https://energy.bntu.by/jour/article/view/223 |
spellingShingle | R. G. Voytko M. A. Korotkevich Selection of Rational Scheme for Inspection of Overhead Power Transmission Lines with 35 kV Voltage and Higher Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika |
title | Selection of Rational Scheme for Inspection of Overhead Power Transmission Lines with 35 kV Voltage and Higher |
title_full | Selection of Rational Scheme for Inspection of Overhead Power Transmission Lines with 35 kV Voltage and Higher |
title_fullStr | Selection of Rational Scheme for Inspection of Overhead Power Transmission Lines with 35 kV Voltage and Higher |
title_full_unstemmed | Selection of Rational Scheme for Inspection of Overhead Power Transmission Lines with 35 kV Voltage and Higher |
title_short | Selection of Rational Scheme for Inspection of Overhead Power Transmission Lines with 35 kV Voltage and Higher |
title_sort | selection of rational scheme for inspection of overhead power transmission lines with 35 kv voltage and higher |
url | https://energy.bntu.by/jour/article/view/223 |
work_keys_str_mv | AT rgvoytko selectionofrationalschemeforinspectionofoverheadpowertransmissionlineswith35kvvoltageandhigher AT makorotkevich selectionofrationalschemeforinspectionofoverheadpowertransmissionlineswith35kvvoltageandhigher |