An Imitation and Heuristic Method for Scheduling with Subcontracted Resources
A scheduling problem with subcontracted resources is widely spread and is associated with the distribution of limited renewable and non-renewable resources, both own and subcontracted ones based on the work’s due dates and the earliest start time. Scheduling’s goal is to reduce the cost of the subco...
Main Authors: | Anna Antonova, Konstantin Aksyonov, Olga Aksyonova |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-08-01
|
Series: | Mathematics |
Subjects: | |
Online Access: | https://www.mdpi.com/2227-7390/9/17/2098 |
Similar Items
-
Algorithms Using List Scheduling and Greedy Strategies for Scheduling in the Flowshop with Resource Constraints
by: Ewa Figielska
Published: (2014-12-01) -
Optimize Unrelated Parallel Machines Scheduling Problems With Multiple Limited Additional Resources, Sequence-Dependent Setup Times and Release Date Constraints
by: Ibrahim M. Al-harkan, et al.
Published: (2019-01-01) -
Uniform Parallel-Machine Scheduling for Minimizing Total Resource Consumption With a Bounded Makespan
by: Shih-Wei Lin, et al.
Published: (2017-01-01) -
Weighted Multi-Skill Resource Constrained Project Scheduling: A Greedy and Parallel Scheduling Approach
by: Saeed Akbar, et al.
Published: (2024-01-01) -
Scheduling of Construction Projects under Resource-Constrained Conditions with a Specifically Developed Software using Genetic Algorithms
by: Mursel Erdal*, et al.
Published: (2021-01-01)