Studi Pengaman Busbar Pada Gardu Induk Amlapura

Busbar safety is a protection system that plays an important role in securing the disruption of the busbar itself. This protection system should work in a sensitive, selective, rapid, and must be stable to disturbance outside the region busbar protection. At the substation Amlapura, if one busbar im...

Full description

Bibliographic Details
Main Authors: I Made Dian Purnawan, I G Dyana Arjana, I W Rinas
Format: Article
Language:English
Published: Universitas Udayana 2016-06-01
Series:Majalah Ilmiah Teknologi Elektro
Online Access:http://ojs.unud.ac.id/index.php/JTE/article/view/17235
_version_ 1819041596749905920
author I Made Dian Purnawan
I G Dyana Arjana
I W Rinas
author_facet I Made Dian Purnawan
I G Dyana Arjana
I W Rinas
author_sort I Made Dian Purnawan
collection DOAJ
description Busbar safety is a protection system that plays an important role in securing the disruption of the busbar itself. This protection system should work in a sensitive, selective, rapid, and must be stable to disturbance outside the region busbar protection. At the substation Amlapura, if one busbar impaired or absence of the busbar securing safety as on the other substation, will lead to an imbalance perceived by the system and can lead to continuity of power flow can be disrupted. Based on the calculations that have been done shows that for short circuit simulation results busbar A and B obtained Amlapura substation fault current that occurs in the amount of 5.538 kA. For the calculation of the impedance zone 1 (80%) primer is 1.9721 + 5.715 ? A Zsekunder with a time delay of 0 seconds or work instantly, Zone 2 (120%) primer is 5.55 ? Z + J 16.0836 primary, Zone 2 (120%) the secondary is 2.958 + J 8.5726 ? Zsekunder with a time delay of 0.4 seconds. Keywords: Busbar, Rele, Short Circuit Analysis, impedance
first_indexed 2024-12-21T09:27:31Z
format Article
id doaj.art-88715064ee8942f78644bbb85324ba37
institution Directory Open Access Journal
issn 1693-2951
2503-2372
language English
last_indexed 2024-12-21T09:27:31Z
publishDate 2016-06-01
publisher Universitas Udayana
record_format Article
series Majalah Ilmiah Teknologi Elektro
spelling doaj.art-88715064ee8942f78644bbb85324ba372022-12-21T19:08:50ZengUniversitas UdayanaMajalah Ilmiah Teknologi Elektro1693-29512503-23722016-06-01151384114590Studi Pengaman Busbar Pada Gardu Induk AmlapuraI Made Dian PurnawanI G Dyana ArjanaI W RinasBusbar safety is a protection system that plays an important role in securing the disruption of the busbar itself. This protection system should work in a sensitive, selective, rapid, and must be stable to disturbance outside the region busbar protection. At the substation Amlapura, if one busbar impaired or absence of the busbar securing safety as on the other substation, will lead to an imbalance perceived by the system and can lead to continuity of power flow can be disrupted. Based on the calculations that have been done shows that for short circuit simulation results busbar A and B obtained Amlapura substation fault current that occurs in the amount of 5.538 kA. For the calculation of the impedance zone 1 (80%) primer is 1.9721 + 5.715 ? A Zsekunder with a time delay of 0 seconds or work instantly, Zone 2 (120%) primer is 5.55 ? Z + J 16.0836 primary, Zone 2 (120%) the secondary is 2.958 + J 8.5726 ? Zsekunder with a time delay of 0.4 seconds. Keywords: Busbar, Rele, Short Circuit Analysis, impedancehttp://ojs.unud.ac.id/index.php/JTE/article/view/17235
spellingShingle I Made Dian Purnawan
I G Dyana Arjana
I W Rinas
Studi Pengaman Busbar Pada Gardu Induk Amlapura
Majalah Ilmiah Teknologi Elektro
title Studi Pengaman Busbar Pada Gardu Induk Amlapura
title_full Studi Pengaman Busbar Pada Gardu Induk Amlapura
title_fullStr Studi Pengaman Busbar Pada Gardu Induk Amlapura
title_full_unstemmed Studi Pengaman Busbar Pada Gardu Induk Amlapura
title_short Studi Pengaman Busbar Pada Gardu Induk Amlapura
title_sort studi pengaman busbar pada gardu induk amlapura
url http://ojs.unud.ac.id/index.php/JTE/article/view/17235
work_keys_str_mv AT imadedianpurnawan studipengamanbusbarpadagarduindukamlapura
AT igdyanaarjana studipengamanbusbarpadagarduindukamlapura
AT iwrinas studipengamanbusbarpadagarduindukamlapura