Factors causing rework and their impact on projects’ performance in Egypt

The Egyptian construction industry suffers from severe delays and cost overruns. Rework is a prime cause of this challenge. Therefore, the objective of this study to identify the root causes of rework for Egyptian construction projects and their impact on the project duration and cost. An extensive...

Full description

Bibliographic Details
Main Authors: Assim Muwafaq Al-Janabi, Mohamed Shawky Abdel-Monem, Karim Mohamed El-Dash
Format: Article
Language:English
Published: Vilnius Gediminas Technical University 2020-08-01
Series:Journal of Civil Engineering and Management
Subjects:
Online Access:https://journals.vgtu.lt/index.php/JCEM/article/view/12916
_version_ 1818890279997931520
author Assim Muwafaq Al-Janabi
Mohamed Shawky Abdel-Monem
Karim Mohamed El-Dash
author_facet Assim Muwafaq Al-Janabi
Mohamed Shawky Abdel-Monem
Karim Mohamed El-Dash
author_sort Assim Muwafaq Al-Janabi
collection DOAJ
description The Egyptian construction industry suffers from severe delays and cost overruns. Rework is a prime cause of this challenge. Therefore, the objective of this study to identify the root causes of rework for Egyptian construction projects and their impact on the project duration and cost. An extensive literature review has been done to identify the most common factors affecting rework. Hence, eighty-seven factors were identified and categorised into ten groups. Structured interview technique was adopted to get the opinions of 67 Egyptian construct professionals for nineteen different construction projects. Total Importance Index of Rework Impact (T.I.I.R.I%) was used to analyse and rank rework factors. Accordingly, the most critical five rework factors are economic situation for the country, schedule compression, design changes, specifications change, and inadequate feasibility study. Based on the survey results, the project stakeholders should consider the critical rework factors during the planning stage and before the project execution, to eliminate or reduce the occurrence and impact of rework causes and to improve the performance of the projects. This paper provides state of the art for rework causes and their effects on construction projects performance, and it can be beneficial for both practitioners and researchers for future work.
first_indexed 2024-12-19T17:22:24Z
format Article
id doaj.art-888e4d5c076f41e9911cfde56588a192
institution Directory Open Access Journal
issn 1392-3730
1822-3605
language English
last_indexed 2024-12-19T17:22:24Z
publishDate 2020-08-01
publisher Vilnius Gediminas Technical University
record_format Article
series Journal of Civil Engineering and Management
spelling doaj.art-888e4d5c076f41e9911cfde56588a1922022-12-21T20:12:39ZengVilnius Gediminas Technical UniversityJournal of Civil Engineering and Management1392-37301822-36052020-08-0126710.3846/jcem.2020.12916Factors causing rework and their impact on projects’ performance in EgyptAssim Muwafaq Al-Janabi0Mohamed Shawky Abdel-Monem1Karim Mohamed El-Dash2Ministry of Planning, Baghdad, Iraq; Department of Civil Engineering at Shoubra, Benha University, EgyptDepartment of Civil Engineering at Shoubra, Benha University, EgyptDepartment of Civil Engineering at Shoubra, Benha University, EgyptThe Egyptian construction industry suffers from severe delays and cost overruns. Rework is a prime cause of this challenge. Therefore, the objective of this study to identify the root causes of rework for Egyptian construction projects and their impact on the project duration and cost. An extensive literature review has been done to identify the most common factors affecting rework. Hence, eighty-seven factors were identified and categorised into ten groups. Structured interview technique was adopted to get the opinions of 67 Egyptian construct professionals for nineteen different construction projects. Total Importance Index of Rework Impact (T.I.I.R.I%) was used to analyse and rank rework factors. Accordingly, the most critical five rework factors are economic situation for the country, schedule compression, design changes, specifications change, and inadequate feasibility study. Based on the survey results, the project stakeholders should consider the critical rework factors during the planning stage and before the project execution, to eliminate or reduce the occurrence and impact of rework causes and to improve the performance of the projects. This paper provides state of the art for rework causes and their effects on construction projects performance, and it can be beneficial for both practitioners and researchers for future work.https://journals.vgtu.lt/index.php/JCEM/article/view/12916construction industryreworkprojectperformancecosttime
spellingShingle Assim Muwafaq Al-Janabi
Mohamed Shawky Abdel-Monem
Karim Mohamed El-Dash
Factors causing rework and their impact on projects’ performance in Egypt
Journal of Civil Engineering and Management
construction industry
rework
project
performance
cost
time
title Factors causing rework and their impact on projects’ performance in Egypt
title_full Factors causing rework and their impact on projects’ performance in Egypt
title_fullStr Factors causing rework and their impact on projects’ performance in Egypt
title_full_unstemmed Factors causing rework and their impact on projects’ performance in Egypt
title_short Factors causing rework and their impact on projects’ performance in Egypt
title_sort factors causing rework and their impact on projects performance in egypt
topic construction industry
rework
project
performance
cost
time
url https://journals.vgtu.lt/index.php/JCEM/article/view/12916
work_keys_str_mv AT assimmuwafaqaljanabi factorscausingreworkandtheirimpactonprojectsperformanceinegypt
AT mohamedshawkyabdelmonem factorscausingreworkandtheirimpactonprojectsperformanceinegypt
AT karimmohamedeldash factorscausingreworkandtheirimpactonprojectsperformanceinegypt