Presentation of a new decision-making plan for prioritizing the rehabilitation of sustainable groundwater resources (case study: 9 aflaj of Oman)
This research for the first time, presents a plan for the rehabilitation of aflaj systems in Oman from a technical point of view. Using the analytical hierarchy process (AHP) in Expert Choice software. Nine famous aflaj systems in Oman were prioritized based on indicators including length, populatio...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
IWA Publishing
2023-12-01
|
Series: | Water Supply |
Subjects: | |
Online Access: | http://ws.iwaponline.com/content/23/12/4908 |
_version_ | 1797368600478089216 |
---|---|
author | Ali Mohtashami Abdullah Al-Ghafri Zahra Al-Abri |
author_facet | Ali Mohtashami Abdullah Al-Ghafri Zahra Al-Abri |
author_sort | Ali Mohtashami |
collection | DOAJ |
description | This research for the first time, presents a plan for the rehabilitation of aflaj systems in Oman from a technical point of view. Using the analytical hierarchy process (AHP) in Expert Choice software. Nine famous aflaj systems in Oman were prioritized based on indicators including length, population, precipitation, discharge, quality, distance from the river network, cultivated area, and soil permeability. A snowball method for selecting participants was used, and a 28-item questionnaire was engaged to assess the relative importance of nine criteria when choosing the prior falaj. A scientific method is applied in a new case in this study to prioritize the aflaj for rehabilitation, and the method applied in this research enables to prioritize them to achieve the desired goal. The AHP method prioritizes the falaj Daris as the first ranking, based on the technical perspectives, with a relative value of 0.222. Findings show that in an equal condition, among these nine aflaj, it would be better that water decision-makers assign the budget to falaj Daris for rehabilitation aims.
HIGHLIGHTS
In this decision making plan, each effective parameter with each number of falaj can be considered.;
This plan can speed the process of choosing the prior falaj for rehabilitation decision.; |
first_indexed | 2024-03-08T17:35:03Z |
format | Article |
id | doaj.art-893d0c106b9c4975a6e07c4e1f06daf5 |
institution | Directory Open Access Journal |
issn | 1606-9749 1607-0798 |
language | English |
last_indexed | 2024-03-08T17:35:03Z |
publishDate | 2023-12-01 |
publisher | IWA Publishing |
record_format | Article |
series | Water Supply |
spelling | doaj.art-893d0c106b9c4975a6e07c4e1f06daf52024-01-02T13:16:54ZengIWA PublishingWater Supply1606-97491607-07982023-12-0123124908492310.2166/ws.2023.310310Presentation of a new decision-making plan for prioritizing the rehabilitation of sustainable groundwater resources (case study: 9 aflaj of Oman)Ali Mohtashami0Abdullah Al-Ghafri1Zahra Al-Abri2 UNESCO Chair on Aflaj Studies and Archaeohydrology, University of Nizwa, Nizwa, Oman UNESCO Chair on Aflaj Studies and Archaeohydrology, University of Nizwa, Nizwa, Oman UNESCO Chair on Aflaj Studies and Archaeohydrology, University of Nizwa, Nizwa, Oman This research for the first time, presents a plan for the rehabilitation of aflaj systems in Oman from a technical point of view. Using the analytical hierarchy process (AHP) in Expert Choice software. Nine famous aflaj systems in Oman were prioritized based on indicators including length, population, precipitation, discharge, quality, distance from the river network, cultivated area, and soil permeability. A snowball method for selecting participants was used, and a 28-item questionnaire was engaged to assess the relative importance of nine criteria when choosing the prior falaj. A scientific method is applied in a new case in this study to prioritize the aflaj for rehabilitation, and the method applied in this research enables to prioritize them to achieve the desired goal. The AHP method prioritizes the falaj Daris as the first ranking, based on the technical perspectives, with a relative value of 0.222. Findings show that in an equal condition, among these nine aflaj, it would be better that water decision-makers assign the budget to falaj Daris for rehabilitation aims. HIGHLIGHTS In this decision making plan, each effective parameter with each number of falaj can be considered.; This plan can speed the process of choosing the prior falaj for rehabilitation decision.;http://ws.iwaponline.com/content/23/12/4908aflaj systemsahpomanrehabilitationsustainable groundwater resource |
spellingShingle | Ali Mohtashami Abdullah Al-Ghafri Zahra Al-Abri Presentation of a new decision-making plan for prioritizing the rehabilitation of sustainable groundwater resources (case study: 9 aflaj of Oman) Water Supply aflaj systems ahp oman rehabilitation sustainable groundwater resource |
title | Presentation of a new decision-making plan for prioritizing the rehabilitation of sustainable groundwater resources (case study: 9 aflaj of Oman) |
title_full | Presentation of a new decision-making plan for prioritizing the rehabilitation of sustainable groundwater resources (case study: 9 aflaj of Oman) |
title_fullStr | Presentation of a new decision-making plan for prioritizing the rehabilitation of sustainable groundwater resources (case study: 9 aflaj of Oman) |
title_full_unstemmed | Presentation of a new decision-making plan for prioritizing the rehabilitation of sustainable groundwater resources (case study: 9 aflaj of Oman) |
title_short | Presentation of a new decision-making plan for prioritizing the rehabilitation of sustainable groundwater resources (case study: 9 aflaj of Oman) |
title_sort | presentation of a new decision making plan for prioritizing the rehabilitation of sustainable groundwater resources case study 9 aflaj of oman |
topic | aflaj systems ahp oman rehabilitation sustainable groundwater resource |
url | http://ws.iwaponline.com/content/23/12/4908 |
work_keys_str_mv | AT alimohtashami presentationofanewdecisionmakingplanforprioritizingtherehabilitationofsustainablegroundwaterresourcescasestudy9aflajofoman AT abdullahalghafri presentationofanewdecisionmakingplanforprioritizingtherehabilitationofsustainablegroundwaterresourcescasestudy9aflajofoman AT zahraalabri presentationofanewdecisionmakingplanforprioritizingtherehabilitationofsustainablegroundwaterresourcescasestudy9aflajofoman |