Using the Artificial Gas Lift to Increase the Productivity of Noor Oil Field / Mishrif Formation

Noor Oil Field is one of Iraqi oil fields located in Missan province / Amarah city. This field is not subjected to licensing rounds, but depends on the national effort of  Missan Oil Company. The first two wells in the field were drilled in seventies and were  not opened to production until 2009. Th...

Full description

Bibliographic Details
Main Authors: Talib A. Salh, Safaa H. Sahi, Shaymaa A. Hussein Ismael
Format: Article
Language:English
Published: University of Baghdad/College of Engineering 2015-06-01
Series:Iraqi Journal of Chemical and Petroleum Engineering
Subjects:
Online Access:http://ijcpe.uobaghdad.edu.iq/index.php/ijcpe/article/view/253
_version_ 1828919048223588352
author Talib A. Salh
Safaa H. Sahi
Shaymaa A. Hussein Ismael
author_facet Talib A. Salh
Safaa H. Sahi
Shaymaa A. Hussein Ismael
author_sort Talib A. Salh
collection DOAJ
description Noor Oil Field is one of Iraqi oil fields located in Missan province / Amarah city. This field is not subjected to licensing rounds, but depends on the national effort of  Missan Oil Company. The first two wells in the field were drilled in seventies and were  not opened to production until 2009. The aim of this study is to study the possibility of using the method of gas lift to increase the productivity of this field . PROSPER software was used to design the continuous  gas lift by using maximum production rate in the design.    The design was made after comparing  the measured pressure with the calculated pressure, this comparison  show  that the method of Beggs-Brill and Petroleum Expert2 gave the best results; therefore, these correlations have been adopted in the design of gas lift.    The  point  of gas injection had been selected;  the optimum  gas injection  rate, the  maximum  oil production rate, the number of valves required for gas injection and their  depth, the  pressure required to open and close each valve  were calculated. The effect of  water-cut, change the amount of ratio of gas to oil and decline  reservoir  pressure in natural flow case and  gas lift  method case were studied. The results of gas lift design show that the maximum oil production rate is (1000) STB/Day and the optimum gas injection rate (2.65) MM Scf/Day at using  operating pressure of (1700) psi available at casing head and the minimum bottom hole  following pressure  is (1501.5) psi.
first_indexed 2024-12-13T21:21:01Z
format Article
id doaj.art-8a3bb031b26d41d5a250ce9afe4ff892
institution Directory Open Access Journal
issn 1997-4884
2618-0707
language English
last_indexed 2024-12-13T21:21:01Z
publishDate 2015-06-01
publisher University of Baghdad/College of Engineering
record_format Article
series Iraqi Journal of Chemical and Petroleum Engineering
spelling doaj.art-8a3bb031b26d41d5a250ce9afe4ff8922022-12-21T23:31:07ZengUniversity of Baghdad/College of EngineeringIraqi Journal of Chemical and Petroleum Engineering1997-48842618-07072015-06-01162Using the Artificial Gas Lift to Increase the Productivity of Noor Oil Field / Mishrif FormationTalib A. SalhSafaa H. SahiShaymaa A. Hussein IsmaelNoor Oil Field is one of Iraqi oil fields located in Missan province / Amarah city. This field is not subjected to licensing rounds, but depends on the national effort of  Missan Oil Company. The first two wells in the field were drilled in seventies and were  not opened to production until 2009. The aim of this study is to study the possibility of using the method of gas lift to increase the productivity of this field . PROSPER software was used to design the continuous  gas lift by using maximum production rate in the design.    The design was made after comparing  the measured pressure with the calculated pressure, this comparison  show  that the method of Beggs-Brill and Petroleum Expert2 gave the best results; therefore, these correlations have been adopted in the design of gas lift.    The  point  of gas injection had been selected;  the optimum  gas injection  rate, the  maximum  oil production rate, the number of valves required for gas injection and their  depth, the  pressure required to open and close each valve  were calculated. The effect of  water-cut, change the amount of ratio of gas to oil and decline  reservoir  pressure in natural flow case and  gas lift  method case were studied. The results of gas lift design show that the maximum oil production rate is (1000) STB/Day and the optimum gas injection rate (2.65) MM Scf/Day at using  operating pressure of (1700) psi available at casing head and the minimum bottom hole  following pressure  is (1501.5) psi.http://ijcpe.uobaghdad.edu.iq/index.php/ijcpe/article/view/253Artificial gas, Noor oil field
spellingShingle Talib A. Salh
Safaa H. Sahi
Shaymaa A. Hussein Ismael
Using the Artificial Gas Lift to Increase the Productivity of Noor Oil Field / Mishrif Formation
Iraqi Journal of Chemical and Petroleum Engineering
Artificial gas, Noor oil field
title Using the Artificial Gas Lift to Increase the Productivity of Noor Oil Field / Mishrif Formation
title_full Using the Artificial Gas Lift to Increase the Productivity of Noor Oil Field / Mishrif Formation
title_fullStr Using the Artificial Gas Lift to Increase the Productivity of Noor Oil Field / Mishrif Formation
title_full_unstemmed Using the Artificial Gas Lift to Increase the Productivity of Noor Oil Field / Mishrif Formation
title_short Using the Artificial Gas Lift to Increase the Productivity of Noor Oil Field / Mishrif Formation
title_sort using the artificial gas lift to increase the productivity of noor oil field mishrif formation
topic Artificial gas, Noor oil field
url http://ijcpe.uobaghdad.edu.iq/index.php/ijcpe/article/view/253
work_keys_str_mv AT talibasalh usingtheartificialgaslifttoincreasetheproductivityofnooroilfieldmishrifformation
AT safaahsahi usingtheartificialgaslifttoincreasetheproductivityofnooroilfieldmishrifformation
AT shaymaaahusseinismael usingtheartificialgaslifttoincreasetheproductivityofnooroilfieldmishrifformation