A new attempt of a CBM tree-like horizontal well: A pilot case of Well ZS 1P-5H in the Qinshui Basin
A multi-lateral horizontal well is one of the main well types employed in the coal bed methane (CBM) development. In a traditional CBM multi-lateral horizontal well, either a major hole or laterals will go crossing through coal beds to the largest extent, which may eventually result in bed collapse,...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
KeAi Communications Co., Ltd.
2014-12-01
|
Series: | Natural Gas Industry B |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2352854014000308 |
_version_ | 1797288313744261120 |
---|---|
author | Yong Yang Shuqing Cui Yuanyong Ni Fengrui Wang Yihan Yang Shumin Lang |
author_facet | Yong Yang Shuqing Cui Yuanyong Ni Fengrui Wang Yihan Yang Shumin Lang |
author_sort | Yong Yang |
collection | DOAJ |
description | A multi-lateral horizontal well is one of the main well types employed in the coal bed methane (CBM) development. In a traditional CBM multi-lateral horizontal well, either a major hole or laterals will go crossing through coal beds to the largest extent, which may eventually result in bed collapse, footage failing to meet the design requirement, and the major hole unable to be monitored, re-entered and flushed. Therefore, this paper puts forward a design idea of a tree-like horizontal well composed of a major hole (for dredging passage), laterals (for controlling drainage area) and sub-laterals (for enhancing production). The major hole is usually drilled on the stable roof or floor of a coal bed, laterals are drilled from the major hole into coal beds, and several sub-laterals are drilled from laterals. The major hole, laterals and sub-laterals constitute a tree-like drainage and recovery system, whose major hole remains stable for a long period and can be monitored and maintained. The technique has been successfully applied in Well ZS 1P-5H in the Qinshui Basin, Shanxi. The well included one major hole, 13 laterals, and 26 sub-laterals, with a total drilling footage of 12288 m, a total coal bed footage of 9512 m, and a total pure coal footage of 9408 m. Its major hole was fully placed in the mudstone of the coal bed roof. This well records a successful case of incident-free single well drilling with a footage of more than 10,000 m and serves as a new well type for efficient CBM development in China. |
first_indexed | 2024-03-07T18:47:30Z |
format | Article |
id | doaj.art-8a48561459c3428e8a09cf1dbbb3ee46 |
institution | Directory Open Access Journal |
issn | 2352-8540 |
language | English |
last_indexed | 2024-03-07T18:47:30Z |
publishDate | 2014-12-01 |
publisher | KeAi Communications Co., Ltd. |
record_format | Article |
series | Natural Gas Industry B |
spelling | doaj.art-8a48561459c3428e8a09cf1dbbb3ee462024-03-02T02:21:34ZengKeAi Communications Co., Ltd.Natural Gas Industry B2352-85402014-12-011220520910.1016/j.ngib.2014.11.013A new attempt of a CBM tree-like horizontal well: A pilot case of Well ZS 1P-5H in the Qinshui BasinYong Yang0Shuqing Cui1Yuanyong Ni2Fengrui Wang3Yihan Yang4Shumin Lang5PetroChina Huabei Oilfield Company, Renqiu, Hebei 062550, ChinaPetroChina Huabei Oilfield Company, Renqiu, Hebei 062550, ChinaPetroChina Huabei Oilfield Company, Renqiu, Hebei 062550, ChinaPetroChina Huabei Oilfield Company, Renqiu, Hebei 062550, ChinaEngineering Design Institute of CNPC Offshore Engineering Co., Ltd., Beijing 100028, ChinaPetroChina Huabei Oilfield Company, Renqiu, Hebei 062550, ChinaA multi-lateral horizontal well is one of the main well types employed in the coal bed methane (CBM) development. In a traditional CBM multi-lateral horizontal well, either a major hole or laterals will go crossing through coal beds to the largest extent, which may eventually result in bed collapse, footage failing to meet the design requirement, and the major hole unable to be monitored, re-entered and flushed. Therefore, this paper puts forward a design idea of a tree-like horizontal well composed of a major hole (for dredging passage), laterals (for controlling drainage area) and sub-laterals (for enhancing production). The major hole is usually drilled on the stable roof or floor of a coal bed, laterals are drilled from the major hole into coal beds, and several sub-laterals are drilled from laterals. The major hole, laterals and sub-laterals constitute a tree-like drainage and recovery system, whose major hole remains stable for a long period and can be monitored and maintained. The technique has been successfully applied in Well ZS 1P-5H in the Qinshui Basin, Shanxi. The well included one major hole, 13 laterals, and 26 sub-laterals, with a total drilling footage of 12288 m, a total coal bed footage of 9512 m, and a total pure coal footage of 9408 m. Its major hole was fully placed in the mudstone of the coal bed roof. This well records a successful case of incident-free single well drilling with a footage of more than 10,000 m and serves as a new well type for efficient CBM development in China.http://www.sciencedirect.com/science/article/pii/S2352854014000308CBMTree-like horizontal wellCoal bedRoof and floorTrunkBoughSub-lateralThe Qinshui Basin |
spellingShingle | Yong Yang Shuqing Cui Yuanyong Ni Fengrui Wang Yihan Yang Shumin Lang A new attempt of a CBM tree-like horizontal well: A pilot case of Well ZS 1P-5H in the Qinshui Basin Natural Gas Industry B CBM Tree-like horizontal well Coal bed Roof and floor Trunk Bough Sub-lateral The Qinshui Basin |
title | A new attempt of a CBM tree-like horizontal well: A pilot case of Well ZS 1P-5H in the Qinshui Basin |
title_full | A new attempt of a CBM tree-like horizontal well: A pilot case of Well ZS 1P-5H in the Qinshui Basin |
title_fullStr | A new attempt of a CBM tree-like horizontal well: A pilot case of Well ZS 1P-5H in the Qinshui Basin |
title_full_unstemmed | A new attempt of a CBM tree-like horizontal well: A pilot case of Well ZS 1P-5H in the Qinshui Basin |
title_short | A new attempt of a CBM tree-like horizontal well: A pilot case of Well ZS 1P-5H in the Qinshui Basin |
title_sort | new attempt of a cbm tree like horizontal well a pilot case of well zs 1p 5h in the qinshui basin |
topic | CBM Tree-like horizontal well Coal bed Roof and floor Trunk Bough Sub-lateral The Qinshui Basin |
url | http://www.sciencedirect.com/science/article/pii/S2352854014000308 |
work_keys_str_mv | AT yongyang anewattemptofacbmtreelikehorizontalwellapilotcaseofwellzs1p5hintheqinshuibasin AT shuqingcui anewattemptofacbmtreelikehorizontalwellapilotcaseofwellzs1p5hintheqinshuibasin AT yuanyongni anewattemptofacbmtreelikehorizontalwellapilotcaseofwellzs1p5hintheqinshuibasin AT fengruiwang anewattemptofacbmtreelikehorizontalwellapilotcaseofwellzs1p5hintheqinshuibasin AT yihanyang anewattemptofacbmtreelikehorizontalwellapilotcaseofwellzs1p5hintheqinshuibasin AT shuminlang anewattemptofacbmtreelikehorizontalwellapilotcaseofwellzs1p5hintheqinshuibasin AT yongyang newattemptofacbmtreelikehorizontalwellapilotcaseofwellzs1p5hintheqinshuibasin AT shuqingcui newattemptofacbmtreelikehorizontalwellapilotcaseofwellzs1p5hintheqinshuibasin AT yuanyongni newattemptofacbmtreelikehorizontalwellapilotcaseofwellzs1p5hintheqinshuibasin AT fengruiwang newattemptofacbmtreelikehorizontalwellapilotcaseofwellzs1p5hintheqinshuibasin AT yihanyang newattemptofacbmtreelikehorizontalwellapilotcaseofwellzs1p5hintheqinshuibasin AT shuminlang newattemptofacbmtreelikehorizontalwellapilotcaseofwellzs1p5hintheqinshuibasin |