Potential Analysis of Renewable Energy in Nduga District Papua Mountain Province

The new renewable energy potential in Papua province is 26,529 MW and the installed capacity in 2018 is 20 MW. In 2025 primary energy is targeted to reach 23% to 31%. The river to the airport is 1.5 km from the airport and the Nogoliah river is at an altitude that has enormous potential and is 24 km...

Full description

Bibliographic Details
Main Authors: Karim Johan, Hardiantono Damis
Format: Article
Language:English
Published: EDP Sciences 2022-01-01
Series:MATEC Web of Conferences
Subjects:
Online Access:https://www.matec-conferences.org/articles/matecconf/pdf/2022/19/matecconf_icst2022_09001.pdf
Description
Summary:The new renewable energy potential in Papua province is 26,529 MW and the installed capacity in 2018 is 20 MW. In 2025 primary energy is targeted to reach 23% to 31%. The river to the airport is 1.5 km from the airport and the Nogoliah river is at an altitude that has enormous potential and is 24 km from the center of Kenyam. With solargis , topographic, measurement methods, and the data 137,450 - 139,500 East Longitude and 4,000 - 4,500 South Latitude produces data for solar Pvout = 1270,7 kWh/Wp = 3,481kWh/Wp, GHI = 1607,4 kWh/m2, DNI = 890,2 kWh/m2, DIF = 929,9 kWh/m2, GTI = 1594,5 kWh/m2 =5740,1 MJ/m2. Data Wind 2019 capacity 1kW, Hub.height 80 m, vestas V90 2000 model turbine, highest daily average in October 0.02% and low MCF in December 1% -highest in February 4.50%. From the topographic map data obtained the slope of the Kenyam river level.