Safety analysis of hull (platform) operation in Bohai sea ice area
<b>Objectives</b> When an offshore nuclear power platform operates in the Bohai Sea area, it faces a threat from floating ice in winter. Therefore, for the sake of safety, it is necessary to analyze the collision process between the floating ice and the platform.<b>Methods</b>...
Main Authors: | DONG Bin, QIAN Yuan, LI Yuantai, DING Jianfeng, LI Hui |
---|---|
Format: | Article |
Language: | English |
Published: |
Editorial Office of Chinese Journal of Ship Research
2020-02-01
|
Series: | Zhongguo Jianchuan Yanjiu |
Subjects: | |
Online Access: | http://html.rhhz.net/ZGJCYJ/html/2020-1-145.htm |
Similar Items
-
Sea Ice Management for Oil and Gas Platforms in the Bohai Sea
by: Zhang Da-yong, et al.
Published: (2017-08-01) -
The spatiotemporal patterns of sea ice in the Bohai Sea during the winter seasons of 2000–2016
by: Lunxi Ouyang, et al.
Published: (2019-08-01) -
Experimental study on flexural strength and effective elastic modulus of granular ice in the Bohai Sea, China
by: Yuanren Xiu, et al.
Published: (2022-09-01) -
Sea Ice Extent Detection in the Bohai Sea Using Sentinel-3 OLCI Data
by: Hua Su, et al.
Published: (2019-10-01) -
Impacts of sea ice on suspended sediment transport during heavy ice years in the Bohai Sea
by: Siyu Liu, et al.
Published: (2024-08-01)