Solving a novel multi-skilled project scheduling model by scatter search

A multi-skilled project scheduling problem (MSPSP) has generally been presented to schedule information technology projects in deterministic conditions. The contribution of this model is to consider the resources, called staff members. These members are regarded as valuable, renewable, and discrete...

Full description

Bibliographic Details
Main Authors: Kazemipoor, H., Tavakkoli-Moghaddam, R., Shahnazari-Shahrezaei, P.
Format: Article
Language:English
Published: Stellenbosch University 2013-05-01
Series:South African Journal of Industrial Engineering
Subjects:
Online Access:http://sajie.journals.ac.za/pub/article/view/651
_version_ 1811314479159312384
author Kazemipoor, H.
Tavakkoli-Moghaddam, R.
Shahnazari-Shahrezaei, P.
author_facet Kazemipoor, H.
Tavakkoli-Moghaddam, R.
Shahnazari-Shahrezaei, P.
author_sort Kazemipoor, H.
collection DOAJ
description A multi-skilled project scheduling problem (MSPSP) has generally been presented to schedule information technology projects in deterministic conditions. The contribution of this model is to consider the resources, called staff members. These members are regarded as valuable, renewable, and discrete resources with different multiple skills. The different skills of staff members, as well as the project networks activity requirement of different skills, cause this problem to become a special type of multi-mode resource-constrained project scheduling problem (MM-RCPSP), with a huge number of modes. Taking into account the importance of this issue and the few studies performed on this problem, a novel mathematical model for the MSPSP is presented. Since the complexity of this problem is NP-hard, an efficient scatter search (SS) algorithm is developed to solve such a difficult problem. This proposed SS is capable of generating optimised solutions in small sizes, and the excellent solutions in large sizes are compared with the solutions reported by a proposed Tabu search (TS) algorithm.
first_indexed 2024-04-13T11:12:27Z
format Article
id doaj.art-8bace041eb6d4ca299c91ade6fbbb744
institution Directory Open Access Journal
issn 1012-277X
2224-7890
language English
last_indexed 2024-04-13T11:12:27Z
publishDate 2013-05-01
publisher Stellenbosch University
record_format Article
series South African Journal of Industrial Engineering
spelling doaj.art-8bace041eb6d4ca299c91ade6fbbb7442022-12-22T02:49:05ZengStellenbosch UniversitySouth African Journal of Industrial Engineering1012-277X2224-78902013-05-0124112113510.7166/24-1-651Solving a novel multi-skilled project scheduling model by scatter searchKazemipoor, H.0Tavakkoli-Moghaddam, R.1Shahnazari-Shahrezaei, P.2Islamic Azad UniversityUniversity of TehranIslamic Azad UniversityA multi-skilled project scheduling problem (MSPSP) has generally been presented to schedule information technology projects in deterministic conditions. The contribution of this model is to consider the resources, called staff members. These members are regarded as valuable, renewable, and discrete resources with different multiple skills. The different skills of staff members, as well as the project networks activity requirement of different skills, cause this problem to become a special type of multi-mode resource-constrained project scheduling problem (MM-RCPSP), with a huge number of modes. Taking into account the importance of this issue and the few studies performed on this problem, a novel mathematical model for the MSPSP is presented. Since the complexity of this problem is NP-hard, an efficient scatter search (SS) algorithm is developed to solve such a difficult problem. This proposed SS is capable of generating optimised solutions in small sizes, and the excellent solutions in large sizes are compared with the solutions reported by a proposed Tabu search (TS) algorithm.http://sajie.journals.ac.za/pub/article/view/651Project scheduling modelscatter search
spellingShingle Kazemipoor, H.
Tavakkoli-Moghaddam, R.
Shahnazari-Shahrezaei, P.
Solving a novel multi-skilled project scheduling model by scatter search
South African Journal of Industrial Engineering
Project scheduling model
scatter search
title Solving a novel multi-skilled project scheduling model by scatter search
title_full Solving a novel multi-skilled project scheduling model by scatter search
title_fullStr Solving a novel multi-skilled project scheduling model by scatter search
title_full_unstemmed Solving a novel multi-skilled project scheduling model by scatter search
title_short Solving a novel multi-skilled project scheduling model by scatter search
title_sort solving a novel multi skilled project scheduling model by scatter search
topic Project scheduling model
scatter search
url http://sajie.journals.ac.za/pub/article/view/651
work_keys_str_mv AT kazemipoorh solvinganovelmultiskilledprojectschedulingmodelbyscattersearch
AT tavakkolimoghaddamr solvinganovelmultiskilledprojectschedulingmodelbyscattersearch
AT shahnazarishahrezaeip solvinganovelmultiskilledprojectschedulingmodelbyscattersearch