Updating parameters of an information model for road construction flow in work development project

Introduction. The article reflects the main trends and problems in the development of information modelling technology in the Russian road industry. A set of mutually integrated domestic software products is presented that provide the formation and support of information models of roads in the life...

Full description

Bibliographic Details
Main Author: T. V. Bobrova
Format: Article
Language:Russian
Published: Siberian State Automobile and Highway University 2023-01-01
Series:Вестник СибАДИ
Subjects:
Online Access:https://vestnik.sibadi.org/jour/article/view/1568
_version_ 1797873388810665984
author T. V. Bobrova
author_facet T. V. Bobrova
author_sort T. V. Bobrova
collection DOAJ
description Introduction. The article reflects the main trends and problems in the development of information modelling technology in the Russian road industry. A set of mutually integrated domestic software products is presented that provide the formation and support of information models of roads in the life cycle process. It has been established that the transition from traditional simulation modelling of building flows to information modelling of flow systems requires a detailed analysis of the lower elements of the flow structure. Such elements in the system of an integrated road construction flow include linear specialized detachments.Models and methods. A single information model of an object as part of the construction organization project (COP) forms the overall strategy for managing the construction of the road. At the stage of the project for the production of works (PPW), it is necessary to take into account the technical and technological features of the contractor in the calendar plan. At the PPW level, it is necessary to create a new structure and define the parameters of this structure in such a way as to satisfy the specified restrictions established by the COP in terms of time and costs,  and also provide for certain reserves for insuring possible risks.  The aim of the study is to develop a methodology for information modelling of a specialized road flow as part of the PPW, taking into account the optimization and updating of its parameters in relation to the conditions of the contracting organization.Results. A modelling algorithm has been developed for creating an updated structure of a specialized linear flow in an integrated computer environment, which provides visualization of a construction site, control and operational management of work in a shared data environment. An example of the implementation of this method is considered when designing a specialized flow, first as part of a COP, with the subsequent updating of this model in the MS Project program when developing a PPW based on a typical flow chart.Conclusion. The use of information modelling creates wide opportunities for analyzing and monitoring the progress of work at the construction site of a linear flow, and also allows you to perform prompt automated restructuring of the loading of detachment vehicles when adjusting the amount of work at the work sites.
first_indexed 2024-04-10T01:15:25Z
format Article
id doaj.art-8bc533bfca2742c8be6b24a09f2b0a4b
institution Directory Open Access Journal
issn 2071-7296
2658-5626
language Russian
last_indexed 2024-04-10T01:15:25Z
publishDate 2023-01-01
publisher Siberian State Automobile and Highway University
record_format Article
series Вестник СибАДИ
spelling doaj.art-8bc533bfca2742c8be6b24a09f2b0a4b2023-03-13T09:52:51ZrusSiberian State Automobile and Highway UniversityВестник СибАДИ2071-72962658-56262023-01-0119691692710.26518/2071-7296-2022-19-6-916-927783Updating parameters of an information model for road construction flow in work development projectT. V. Bobrova0Сибирский государственный автомобильно-дорожный университет «СибАДИ»Introduction. The article reflects the main trends and problems in the development of information modelling technology in the Russian road industry. A set of mutually integrated domestic software products is presented that provide the formation and support of information models of roads in the life cycle process. It has been established that the transition from traditional simulation modelling of building flows to information modelling of flow systems requires a detailed analysis of the lower elements of the flow structure. Such elements in the system of an integrated road construction flow include linear specialized detachments.Models and methods. A single information model of an object as part of the construction organization project (COP) forms the overall strategy for managing the construction of the road. At the stage of the project for the production of works (PPW), it is necessary to take into account the technical and technological features of the contractor in the calendar plan. At the PPW level, it is necessary to create a new structure and define the parameters of this structure in such a way as to satisfy the specified restrictions established by the COP in terms of time and costs,  and also provide for certain reserves for insuring possible risks.  The aim of the study is to develop a methodology for information modelling of a specialized road flow as part of the PPW, taking into account the optimization and updating of its parameters in relation to the conditions of the contracting organization.Results. A modelling algorithm has been developed for creating an updated structure of a specialized linear flow in an integrated computer environment, which provides visualization of a construction site, control and operational management of work in a shared data environment. An example of the implementation of this method is considered when designing a specialized flow, first as part of a COP, with the subsequent updating of this model in the MS Project program when developing a PPW based on a typical flow chart.Conclusion. The use of information modelling creates wide opportunities for analyzing and monitoring the progress of work at the construction site of a linear flow, and also allows you to perform prompt automated restructuring of the loading of detachment vehicles when adjusting the amount of work at the work sites.https://vestnik.sibadi.org/jour/article/view/1568информационное моделированиеспециализированный дорожно-строительный потоккарта трудового процессаинтегрированная компьютерная среда
spellingShingle T. V. Bobrova
Updating parameters of an information model for road construction flow in work development project
Вестник СибАДИ
информационное моделирование
специализированный дорожно-строительный поток
карта трудового процесса
интегрированная компьютерная среда
title Updating parameters of an information model for road construction flow in work development project
title_full Updating parameters of an information model for road construction flow in work development project
title_fullStr Updating parameters of an information model for road construction flow in work development project
title_full_unstemmed Updating parameters of an information model for road construction flow in work development project
title_short Updating parameters of an information model for road construction flow in work development project
title_sort updating parameters of an information model for road construction flow in work development project
topic информационное моделирование
специализированный дорожно-строительный поток
карта трудового процесса
интегрированная компьютерная среда
url https://vestnik.sibadi.org/jour/article/view/1568
work_keys_str_mv AT tvbobrova updatingparametersofaninformationmodelforroadconstructionflowinworkdevelopmentproject