A decision-making method to assess the benefits of a semi-mobile in-pit crushing and conveying alternative during the early stages of a mining project

Abstract A significant cost in the operating budget of most mining operations arises from purchasing and maintaining haulage trucks. Recently, in-pit crushing and conveying (IPCC) has been subject to research because of its potential to reduce haulage costs. The objective of this study is to identif...

Full description

Bibliographic Details
Main Authors: Rodrigo Augusto Nunes, Homero Delboni Junior, Giorgio de Tomi, Cecília Beatriz Infante, Bladen Allan
Format: Article
Language:English
Published: Fundação Gorceix
Series:REM: International Engineering Journal
Subjects:
Online Access:http://www.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2019000300285&lng=en&tlng=en
_version_ 1818836646792003584
author Rodrigo Augusto Nunes
Homero Delboni Junior
Giorgio de Tomi
Cecília Beatriz Infante
Bladen Allan
author_facet Rodrigo Augusto Nunes
Homero Delboni Junior
Giorgio de Tomi
Cecília Beatriz Infante
Bladen Allan
author_sort Rodrigo Augusto Nunes
collection DOAJ
description Abstract A significant cost in the operating budget of most mining operations arises from purchasing and maintaining haulage trucks. Recently, in-pit crushing and conveying (IPCC) has been subject to research because of its potential to reduce haulage costs. The objective of this study is to identify early on in a project, by means of a decision-making method, whether or not the semi-mobile IPCC (SMIPCC) is an appropriate alternative to the conventional truck haulage method on the loading and hauling approaches. This method is based on cost analysis and the evaluation of environmental impacts, being successfully tested at an existing open-pit mine, where the results indicated that the IPCC was the most cost-effective option for the operation. Although the IPCC's initial CAPEX was 60% higher than the conventional approach, the IPCC's OPEX was 43% lower, resulting in a 28% reduction of the life-of-mine net present cost (NPC).
first_indexed 2024-12-19T03:09:55Z
format Article
id doaj.art-8c68785edb6a4a47a21401d1da46a3a0
institution Directory Open Access Journal
issn 2448-167X
language English
last_indexed 2024-12-19T03:09:55Z
publisher Fundação Gorceix
record_format Article
series REM: International Engineering Journal
spelling doaj.art-8c68785edb6a4a47a21401d1da46a3a02022-12-21T20:38:03ZengFundação GorceixREM: International Engineering Journal2448-167X72228529110.1590/0370-44672018720109S2448-167X2019000300285A decision-making method to assess the benefits of a semi-mobile in-pit crushing and conveying alternative during the early stages of a mining projectRodrigo Augusto NunesHomero Delboni JuniorGiorgio de TomiCecília Beatriz InfanteBladen AllanAbstract A significant cost in the operating budget of most mining operations arises from purchasing and maintaining haulage trucks. Recently, in-pit crushing and conveying (IPCC) has been subject to research because of its potential to reduce haulage costs. The objective of this study is to identify early on in a project, by means of a decision-making method, whether or not the semi-mobile IPCC (SMIPCC) is an appropriate alternative to the conventional truck haulage method on the loading and hauling approaches. This method is based on cost analysis and the evaluation of environmental impacts, being successfully tested at an existing open-pit mine, where the results indicated that the IPCC was the most cost-effective option for the operation. Although the IPCC's initial CAPEX was 60% higher than the conventional approach, the IPCC's OPEX was 43% lower, resulting in a 28% reduction of the life-of-mine net present cost (NPC).http://www.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2019000300285&lng=en&tlng=ensemi-mobile IPCCcost savingdecision-making methodinitial design studyCO reduction
spellingShingle Rodrigo Augusto Nunes
Homero Delboni Junior
Giorgio de Tomi
Cecília Beatriz Infante
Bladen Allan
A decision-making method to assess the benefits of a semi-mobile in-pit crushing and conveying alternative during the early stages of a mining project
REM: International Engineering Journal
semi-mobile IPCC
cost saving
decision-making method
initial design study
CO reduction
title A decision-making method to assess the benefits of a semi-mobile in-pit crushing and conveying alternative during the early stages of a mining project
title_full A decision-making method to assess the benefits of a semi-mobile in-pit crushing and conveying alternative during the early stages of a mining project
title_fullStr A decision-making method to assess the benefits of a semi-mobile in-pit crushing and conveying alternative during the early stages of a mining project
title_full_unstemmed A decision-making method to assess the benefits of a semi-mobile in-pit crushing and conveying alternative during the early stages of a mining project
title_short A decision-making method to assess the benefits of a semi-mobile in-pit crushing and conveying alternative during the early stages of a mining project
title_sort decision making method to assess the benefits of a semi mobile in pit crushing and conveying alternative during the early stages of a mining project
topic semi-mobile IPCC
cost saving
decision-making method
initial design study
CO reduction
url http://www.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2019000300285&lng=en&tlng=en
work_keys_str_mv AT rodrigoaugustonunes adecisionmakingmethodtoassessthebenefitsofasemimobileinpitcrushingandconveyingalternativeduringtheearlystagesofaminingproject
AT homerodelbonijunior adecisionmakingmethodtoassessthebenefitsofasemimobileinpitcrushingandconveyingalternativeduringtheearlystagesofaminingproject
AT giorgiodetomi adecisionmakingmethodtoassessthebenefitsofasemimobileinpitcrushingandconveyingalternativeduringtheearlystagesofaminingproject
AT ceciliabeatrizinfante adecisionmakingmethodtoassessthebenefitsofasemimobileinpitcrushingandconveyingalternativeduringtheearlystagesofaminingproject
AT bladenallan adecisionmakingmethodtoassessthebenefitsofasemimobileinpitcrushingandconveyingalternativeduringtheearlystagesofaminingproject
AT rodrigoaugustonunes decisionmakingmethodtoassessthebenefitsofasemimobileinpitcrushingandconveyingalternativeduringtheearlystagesofaminingproject
AT homerodelbonijunior decisionmakingmethodtoassessthebenefitsofasemimobileinpitcrushingandconveyingalternativeduringtheearlystagesofaminingproject
AT giorgiodetomi decisionmakingmethodtoassessthebenefitsofasemimobileinpitcrushingandconveyingalternativeduringtheearlystagesofaminingproject
AT ceciliabeatrizinfante decisionmakingmethodtoassessthebenefitsofasemimobileinpitcrushingandconveyingalternativeduringtheearlystagesofaminingproject
AT bladenallan decisionmakingmethodtoassessthebenefitsofasemimobileinpitcrushingandconveyingalternativeduringtheearlystagesofaminingproject