Investigation on Disaster Mechanism of Diversion Tunnel Induced by Gripper TBM in Hydrokarst Erosion Stratum and Engineering Measures
In gripper tunnel boring machine (TBM) tunneling through complex geological formations, the safe and efficient recovery from large-scale collapses remains a formidable challenge. In this study, we investigate the causes of a 1246 m<sup>3</sup> collapse that occurred during the gripper TB...
Main Author: | Tengtian Yang |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2024-02-01
|
Series: | Buildings |
Subjects: | |
Online Access: | https://www.mdpi.com/2075-5309/14/3/625 |
Similar Items
-
Prediction of Stresses and Settlement for TBM Tunnel Surrounding Soil
by: Halah Hashim Muhammed, et al.
Published: (2019-12-01) -
Feedback on a shared big dataset for intelligent TBM Part II: Application and forward look
by: Jian-Bin Li, et al.
Published: (2023-08-01) -
FUZZY LOGIC MODELLING TO PREDICT THE LEVEL OF GEOTECHNICAL RISKS IN ROCK TUNNEL BORING MACHINE (TBM) TUNNELLING
by: Mohammad Hossein Arbabsiar, et al.
Published: (2020-01-01) -
Parameters used for prediction of settlement trough due to TBM tunnelling
by: Witold Bogusz, et al.
Published: (2021-12-01) -
Subsidence trough asymmetry calculations in twin tube TBM tunnelling
by: Rafał Kuszyk, et al.
Published: (2021-06-01)