Two-Stage Coordinated Operational Strategy for Distributed Energy Resources Considering Wind Power Curtailment Penalty Cost
The concept of virtual power plant (VPP) has been proposed to facilitate the integration of distributed renewable energy. VPP behaves similar to a single entity that aggregates a collection of distributed energy resources (DERs) such as distributed generators, storage devices, flexible loads, etc.,...
Main Authors: | Jing Qiu, Junhua Zhao, Dongxiao Wang, Yu Zheng |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2017-07-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/10/7/965 |
Similar Items
-
Optimising onshore wind with energy storage considering curtailment
by: F. Biggins, et al.
Published: (2022-11-01) -
System Optimization and Operating Strategy of Single-Stage Air Source Heat Pump with Thermal Storage to Reduce Wind Power Curtailment
by: Qianyue Ren, et al.
Published: (2024-07-01) -
Risk-constrained transmission network expansion planning in competitive electricity markets considering expected energy not supplied and wind curtailment
by: Taghi Barforoushi, et al.
Published: (2022-09-01) -
Mitigation of Short-Term Wind Power Ramps through Forecast-Based Curtailment
by: Oliver Probst, et al.
Published: (2021-05-01) -
The Active Power and Reactive Power Dispatch Plan of DFIG Based Wind Farm Considering Wind Power Curtailment
by: Zengping Wang, et al.
Published: (2015-06-01)