Capacity Analysis and Understanding of Pilot Test Well in Gas Storage A

There is a relatively simple gas reservoir structure in gas storage A, with good trap sealing, large cap rock thickness, relatively inactive fault activity, good overall reservoir connectivity, large storage capacity, water invasion occurs in only a few wells in the low part of the structure, so the...

Full description

Bibliographic Details
Main Author: Li Weiyan
Format: Article
Language:English
Published: EDP Sciences 2023-01-01
Series:E3S Web of Conferences
Subjects:
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/12/e3sconf_esat2023_01044.pdf
Description
Summary:There is a relatively simple gas reservoir structure in gas storage A, with good trap sealing, large cap rock thickness, relatively inactive fault activity, good overall reservoir connectivity, large storage capacity, water invasion occurs in only a few wells in the low part of the structure, so there are the geological conditions for building gas storage reservoir. This paper analyzed the capacity and maximum recovery capacity of horizontal wells in this block, and the pressure influence range during the recovery process of high-speed pilot production through the pilot test of reservoir construction; moreover, it got the following understanding: the horizontal wells with good development effect, high recovery capacity, and the pressure influence range in this block are mainly within 400m from the well distance; there are differences in the gas production capacity of different types of reservoirs, and the capacity contribution of Class I reservoirs is large, while the capacity contribution of Class II and III reservoirs is small, together these believe that Shengping gas storage has the capacity conditions for building reservoir.
ISSN:2267-1242