PENELITIAN AWAL PENENTUAN WAKTU PENYELESAIAN PROYEK DENGAN METODE PERT PROJECT EVALUATION AND REVIEW TECHNIQUE

Construction involves many activities. Every activity need a portion of time which is defined as duration. Duration is a statistic probabilistic variable, which is expressed in a range of values. So the total time required to complete a construction project is also expressed in a range of times, thu...

Full description

Bibliographic Details
Main Authors: Sentosa Limanto, Tirta Djusman Arief
Format: Article
Language:English
Published: Petra Christian University 2002-01-01
Series:Civil Engineering Dimension
Subjects:
Online Access:http://puslit2.petra.ac.id/ejournal/index.php/civ/article/view/15549
Description
Summary:Construction involves many activities. Every activity need a portion of time which is defined as duration. Duration is a statistic probabilistic variable, which is expressed in a range of values. So the total time required to complete a construction project is also expressed in a range of times, thus the use of PERT to evaluate construction time is considered to be more realistic. An observation on a construction of a warehouse in steel structure in Surabaya shows that this method gives a tendency of good result. Abstract in Bahasa Indonesia : Pembangunan melibatkan banyak aktivitas. Tiap aktivitas memerlukan sejumlah waktu, yang didefinisikan sebagai durasi. Durasi adalah sebuah besaran statistik probabilistik, yang dinyatakan dalam satu interval nilai. Maka total waktu yang diperlukan untuk menyelesaikan pembangunan juga dinyatakan dalam satu interval waktu, sehingga penetapan waktu penyelesaian proyek dengan metode PERT dirasakan lebih realistis. Pengamatan atas pelaksanaan sebuah gudang yang terbuat dari struktur baja, di Surabaya, menunjukkan bahwa metode ini memberikan kecenderungan hasil yang baik.
ISSN:1410-9530
1979-570X