_version_ 1797872290819473408
author A. F. Borodin
V. V. Panin
M. A. Ageeva
A. Yu. Sokolov
S. Yu. Kirillova
E. O. Dmitriev
A. A. Kravchenko
author_facet A. F. Borodin
V. V. Panin
M. A. Ageeva
A. Yu. Sokolov
S. Yu. Kirillova
E. O. Dmitriev
A. A. Kravchenko
author_sort A. F. Borodin
collection DOAJ
description Introduction. Traffic and transportation capacities of railway polygons and traffic flows are not constant throughout the year. Permissible capacity levels are determined by the condition of unhindered reception of trains by stations. It is necessary to calculate the balance of transportation capacity, making it possible to combine growing traffic with high rates with infrastructure development and repair works. The purpose of the study is to develop methodological solutions for assessing the balance of the railway transportation capacity and substantiating the procedure for implementing infrastructure measures in the context of the growing dynamics of the originating traffic and the tight deadlines for repairing and reconstructing the infrastructure.Materials and methods. The developed solutions are based on the data of the Russian Railways information systems, automated forecasting of the infrastructure and transportation resources of the railway network, and hybrid mathematical models.Results. The article presented the results of the substantiation of the normative restrictions on the daily time budget for the passage of trains, depending on the classification and specialisation of railway lines. The procedure for calculating the traffic capacity of sections with automatic locomotive signalling is determined as an independent means of interval control of train traffic with movable boundaries of block sections that change depending on the speed and mass of the train. The characteristics of the available, estimated, planned and required traffic and transportation capacities were determined with a distinction between measures for the development of traffic and transportation capacities and programs for improvement of infrastructure facilities. The authors put forward the problem of compromise management to ensure the required volumes of freight and passenger traffic, a given volume of reconstruction work on the development of infrastructure and repair work to maintain the required degree of its readiness. A classification of reconstructive, technological, organisational, technical and complex measures of influence on the unevenness of transport processes in the conditions of depletion of infrastructure and scheduling resources was presented.Discussion and conclusion. The developed solutions enable to increase the feasibility and efficiency of complex projects for the development of traffic and transportation capacities and measures to improve the operation of railway network polygons.
first_indexed 2024-04-10T00:56:27Z
format Article
id doaj.art-8e822de0e94d42bf81d802b36429b3f4
institution Directory Open Access Journal
issn 2223-9731
2713-2560
language Russian
last_indexed 2024-04-10T00:56:27Z
publishDate 2022-06-01
publisher Joint Stock Company «Railway Scientific and Research Institute»
record_format Article
series Вестник Научно-исследовательского института железнодорожного транспорта
spelling doaj.art-8e822de0e94d42bf81d802b36429b3f42023-03-13T10:14:34ZrusJoint Stock Company «Railway Scientific and Research Institute»Вестник Научно-исследовательского института железнодорожного транспорта2223-97312713-25602022-06-0181215816910.21780/2223-9731-2022-81-2-158-169381Assessment of transportation capacity balance of railway network polygonsA. F. Borodin0V. V. Panin1M. A. Ageeva2A. Yu. Sokolov3S. Yu. Kirillova4E. O. Dmitriev5A. A. Kravchenko6Институт экономики и развития транспорта (ИЭРТ); Российский университет транспорта (РУТ (МИИТ)Институт экономики и развития транспорта (ИЭРТ); Российский университет транспорта (РУТ (МИИТ)Институт экономики и развития транспорта (ИЭРТ)Институт экономики и развития транспорта (ИЭРТ)Институт экономики и развития транспорта (ИЭРТ)Институт экономики и развития транспорта (ИЭРТ); Российский университет транспорта (РУТ (МИИТ)Институт экономики и развития транспорта (ИЭРТ); Российский университет транспорта (РУТ (МИИТ)Introduction. Traffic and transportation capacities of railway polygons and traffic flows are not constant throughout the year. Permissible capacity levels are determined by the condition of unhindered reception of trains by stations. It is necessary to calculate the balance of transportation capacity, making it possible to combine growing traffic with high rates with infrastructure development and repair works. The purpose of the study is to develop methodological solutions for assessing the balance of the railway transportation capacity and substantiating the procedure for implementing infrastructure measures in the context of the growing dynamics of the originating traffic and the tight deadlines for repairing and reconstructing the infrastructure.Materials and methods. The developed solutions are based on the data of the Russian Railways information systems, automated forecasting of the infrastructure and transportation resources of the railway network, and hybrid mathematical models.Results. The article presented the results of the substantiation of the normative restrictions on the daily time budget for the passage of trains, depending on the classification and specialisation of railway lines. The procedure for calculating the traffic capacity of sections with automatic locomotive signalling is determined as an independent means of interval control of train traffic with movable boundaries of block sections that change depending on the speed and mass of the train. The characteristics of the available, estimated, planned and required traffic and transportation capacities were determined with a distinction between measures for the development of traffic and transportation capacities and programs for improvement of infrastructure facilities. The authors put forward the problem of compromise management to ensure the required volumes of freight and passenger traffic, a given volume of reconstruction work on the development of infrastructure and repair work to maintain the required degree of its readiness. A classification of reconstructive, technological, organisational, technical and complex measures of influence on the unevenness of transport processes in the conditions of depletion of infrastructure and scheduling resources was presented.Discussion and conclusion. The developed solutions enable to increase the feasibility and efficiency of complex projects for the development of traffic and transportation capacities and measures to improve the operation of railway network polygons.https://www.journal-vniizht.ru/jour/article/view/604баланс провозной способностиперевозочная мощностьинфраструктурные мероприятиябюджет времениинтервальное регулированиеорганизация движениякомпромиссное управлениенеравномерность транспортных процессовпрогноз ресурсов сетигибридные математические модели
spellingShingle A. F. Borodin
V. V. Panin
M. A. Ageeva
A. Yu. Sokolov
S. Yu. Kirillova
E. O. Dmitriev
A. A. Kravchenko
Assessment of transportation capacity balance of railway network polygons
Вестник Научно-исследовательского института железнодорожного транспорта
баланс провозной способности
перевозочная мощность
инфраструктурные мероприятия
бюджет времени
интервальное регулирование
организация движения
компромиссное управление
неравномерность транспортных процессов
прогноз ресурсов сети
гибридные математические модели
title Assessment of transportation capacity balance of railway network polygons
title_full Assessment of transportation capacity balance of railway network polygons
title_fullStr Assessment of transportation capacity balance of railway network polygons
title_full_unstemmed Assessment of transportation capacity balance of railway network polygons
title_short Assessment of transportation capacity balance of railway network polygons
title_sort assessment of transportation capacity balance of railway network polygons
topic баланс провозной способности
перевозочная мощность
инфраструктурные мероприятия
бюджет времени
интервальное регулирование
организация движения
компромиссное управление
неравномерность транспортных процессов
прогноз ресурсов сети
гибридные математические модели
url https://www.journal-vniizht.ru/jour/article/view/604
work_keys_str_mv AT afborodin assessmentoftransportationcapacitybalanceofrailwaynetworkpolygons
AT vvpanin assessmentoftransportationcapacitybalanceofrailwaynetworkpolygons
AT maageeva assessmentoftransportationcapacitybalanceofrailwaynetworkpolygons
AT ayusokolov assessmentoftransportationcapacitybalanceofrailwaynetworkpolygons
AT syukirillova assessmentoftransportationcapacitybalanceofrailwaynetworkpolygons
AT eodmitriev assessmentoftransportationcapacitybalanceofrailwaynetworkpolygons
AT aakravchenko assessmentoftransportationcapacitybalanceofrailwaynetworkpolygons