OPTIMASI SISTEM PERSEDIAAN BAHAN BAKU PT. TC

<p>In operation in PT TC has a control system in which the materials available material has significant costs each year so that researchers try to examine that it could not happen. In this study were discussed in detail is the A grade material for class A material has a high percentage is 94.2...

Full description

Bibliographic Details
Main Authors: daniel sembiring, andri andri
Format: Article
Language:Indonesian
Published: Lembaga Penelitian Universitas Indraprasta PGRI 2018-03-01
Series:Faktor Exacta
Online Access:http://journal.lppmunindra.ac.id/index.php/Faktor_Exacta/article/view/1938
_version_ 1818511474430050304
author daniel sembiring
andri andri
author_facet daniel sembiring
andri andri
author_sort daniel sembiring
collection DOAJ
description <p>In operation in PT TC has a control system in which the materials available material has significant costs each year so that researchers try to examine that it could not happen. In this study were discussed in detail is the A grade material for class A material has a high percentage is 94.29%. A class of materials is the PAC 8C which is one of the materials used every second and for 24 hours non-stop to produce water. Then the author forecasting material needs in coming years carried out by the method of forecasting the moving average (Moving Average) and results tracking signal is positive, it means the material needs of the coming year are greater than they are today. Tracking signal obtained still included within the limits of ± 4 means that the reliability of forecasting acceptable. Comparison inventory system that has been applied in the company with inventory system models Economic Order Quantity, P, and Min-Max do to make it look which system is better. From the comparison of the three models obtained EOQ method is the inventory control system that is the best because it can save the cost of Rp 162,085,358.</p><p><span>Keywords: Economic Order Quantity, System P, Min - Max, ABC Classification</span></p>
first_indexed 2024-12-10T23:33:45Z
format Article
id doaj.art-8ece23fe1c2e4e5ca4e4d9691188f169
institution Directory Open Access Journal
issn 1979-276X
2502-339X
language Indonesian
last_indexed 2024-12-10T23:33:45Z
publishDate 2018-03-01
publisher Lembaga Penelitian Universitas Indraprasta PGRI
record_format Article
series Faktor Exacta
spelling doaj.art-8ece23fe1c2e4e5ca4e4d9691188f1692022-12-22T01:29:15ZindLembaga Penelitian Universitas Indraprasta PGRIFaktor Exacta1979-276X2502-339X2018-03-011111610.30998/faktorexacta.v11i1.19381729OPTIMASI SISTEM PERSEDIAAN BAHAN BAKU PT. TCdaniel sembiring0andri andri1Institut Teknologi Indonesia, SerpongUniversitas Indraprasta PGRI<p>In operation in PT TC has a control system in which the materials available material has significant costs each year so that researchers try to examine that it could not happen. In this study were discussed in detail is the A grade material for class A material has a high percentage is 94.29%. A class of materials is the PAC 8C which is one of the materials used every second and for 24 hours non-stop to produce water. Then the author forecasting material needs in coming years carried out by the method of forecasting the moving average (Moving Average) and results tracking signal is positive, it means the material needs of the coming year are greater than they are today. Tracking signal obtained still included within the limits of ± 4 means that the reliability of forecasting acceptable. Comparison inventory system that has been applied in the company with inventory system models Economic Order Quantity, P, and Min-Max do to make it look which system is better. From the comparison of the three models obtained EOQ method is the inventory control system that is the best because it can save the cost of Rp 162,085,358.</p><p><span>Keywords: Economic Order Quantity, System P, Min - Max, ABC Classification</span></p>http://journal.lppmunindra.ac.id/index.php/Faktor_Exacta/article/view/1938
spellingShingle daniel sembiring
andri andri
OPTIMASI SISTEM PERSEDIAAN BAHAN BAKU PT. TC
Faktor Exacta
title OPTIMASI SISTEM PERSEDIAAN BAHAN BAKU PT. TC
title_full OPTIMASI SISTEM PERSEDIAAN BAHAN BAKU PT. TC
title_fullStr OPTIMASI SISTEM PERSEDIAAN BAHAN BAKU PT. TC
title_full_unstemmed OPTIMASI SISTEM PERSEDIAAN BAHAN BAKU PT. TC
title_short OPTIMASI SISTEM PERSEDIAAN BAHAN BAKU PT. TC
title_sort optimasi sistem persediaan bahan baku pt tc
url http://journal.lppmunindra.ac.id/index.php/Faktor_Exacta/article/view/1938
work_keys_str_mv AT danielsembiring optimasisistempersediaanbahanbakupttc
AT andriandri optimasisistempersediaanbahanbakupttc