BASIC PRINCIPLES OF ORGANIZING OF REPAIR OF A NEW GENERATION OF ELECTRIC POWER LINES 220 kV AND ABOVE

The article describes the requirements for repair work on single circuit and double circuit overhead transmission lines of compact (VL) and controlled self-compensating high voltage transmission power lines (CSHVL).These include overhead power lines to a new generation. They differ from traditional...

Full description

Bibliographic Details
Main Authors: Postolaty V.M., Bikova E.V., Suslov V.M., Shakarian Ui.G., TIMASHOVA L.V., Kareva S.N.
Format: Article
Language:English
Published: Academy of Sciences of Moldova 2011-08-01
Series:Problems of the Regional Energetics
Subjects:
Online Access:http://journal.ie.asm.md/assets/files/m71_2_176.doc
Description
Summary:The article describes the requirements for repair work on single circuit and double circuit overhead transmission lines of compact (VL) and controlled self-compensating high voltage transmission power lines (CSHVL).These include overhead power lines to a new generation. They differ from traditional overhead using compact designs of supports, the convergence phase of the spans, circuits and substations connections to ways of regulation. With this new generation have the overhead compared to conventional overhead increased bandwidth and improved technical and economic indicators. The design and features of the new circuit overhead lines require a series of new campaigns for the organization of repairs, which are discussed in this article.
ISSN:1857-0070