BASIC PRINCIPLES OF ORGANIZING OF REPAIR OF A NEW GENERATION OF ELECTRIC POWER LINES 220 kV AND ABOVE
The article describes the requirements for repair work on single circuit and double circuit overhead transmission lines of compact (VL) and controlled self-compensating high voltage transmission power lines (CSHVL).These include overhead power lines to a new generation. They differ from traditional...
Main Authors: | Postolaty V.M., Bikova E.V., Suslov V.M., Shakarian Ui.G., TIMASHOVA L.V., Kareva S.N. |
---|---|
Format: | Article |
Language: | English |
Published: |
Academy of Sciences of Moldova
2011-08-01
|
Series: | Problems of the Regional Energetics |
Subjects: | |
Online Access: | http://journal.ie.asm.md/assets/files/m71_2_176.doc |
Similar Items
-
METHODICAL APPROACHES TO THE CHOICE OF THE NEW GENERATION OF HIGH-VOLTAGE POWER TRANSMISSION LINE 220 kV OPTIONS
by: POSTOLATI V.M., et al.
Published: (2010-08-01) -
CHARACTERISTICS OF POWER SELF-COMPENSATED TRANSMISSION LINES EXTREMELY COMPACT 330-350 kV
by: Postolaty V.M., et al.
Published: (2013-12-01) -
Eficienţa liniilor electrice aeriene compacte dirijate
by: Postolaty V.M., et al.
Published: (2015-12-01) -
Efficiency of the Compact Controlled High -Voltage Power Lines
by: Postolaty V.M., et al.
Published: (2015-12-01) -
MODELING OF OVER VOLTAGES IN 10 kV CABLE DISTRIBUTION NETWORK AT SINGLE-PHASE FAULTS TO GROUND WITH ARC
by: Bosneaga V.A, et al.
Published: (2013-04-01)