Application of EDG AOT Extension Based on the Risk-Informed Method in NPPs

At present, the allowed outage time (AOT) of an M310 unit emergency diesel generator (EDG) was 3 days, which can be extended to 14 days through replacement of additional diesel units; although it provides a certain online maintenance time, it cannot meet the needs of ten-years overhauls. In order to...

Full description

Bibliographic Details
Main Authors: Yunxin Feng, Wei Hu
Format: Article
Language:English
Published: Hindawi Limited 2023-01-01
Series:Science and Technology of Nuclear Installations
Online Access:http://dx.doi.org/10.1155/2023/8435835
_version_ 1826993051364491264
author Yunxin Feng
Wei Hu
author_facet Yunxin Feng
Wei Hu
author_sort Yunxin Feng
collection DOAJ
description At present, the allowed outage time (AOT) of an M310 unit emergency diesel generator (EDG) was 3 days, which can be extended to 14 days through replacement of additional diesel units; although it provides a certain online maintenance time, it cannot meet the needs of ten-years overhauls. In order to avoid stopping the reactor for maintenance of NPP due to insufficient of EDG AOT, based on risk-informed method analysis feasibility of extending AOT for EDG to 28 days, we quantitatively calculate the impact of extension of AOT on risk level of nuclear power plants (NPPs). Analysis shows that extension of EDG AOT to 28 days has less impact on NPPs, and safety of NPPs can be further ensured through temporary risk control measures, so the extension of AOT to 28 days is acceptable. By using risk-informed technology to extend AOT for EDG, unnecessary shutdown and maintenance is avoided and the economy of NPPs and flexibility of maintenance work arrangement is greatly improved while ensuring safety, which is of great significance to operation and maintenance of NPPs.
first_indexed 2024-04-10T22:43:12Z
format Article
id doaj.art-8fb7fb9b169440939201fe4421c201e3
institution Directory Open Access Journal
issn 1687-6083
language English
last_indexed 2025-02-18T08:58:52Z
publishDate 2023-01-01
publisher Hindawi Limited
record_format Article
series Science and Technology of Nuclear Installations
spelling doaj.art-8fb7fb9b169440939201fe4421c201e32024-11-02T23:53:53ZengHindawi LimitedScience and Technology of Nuclear Installations1687-60832023-01-01202310.1155/2023/8435835Application of EDG AOT Extension Based on the Risk-Informed Method in NPPsYunxin Feng0Wei Hu1School of Automation EngineeringNuclear Power Operation Research InstituteAt present, the allowed outage time (AOT) of an M310 unit emergency diesel generator (EDG) was 3 days, which can be extended to 14 days through replacement of additional diesel units; although it provides a certain online maintenance time, it cannot meet the needs of ten-years overhauls. In order to avoid stopping the reactor for maintenance of NPP due to insufficient of EDG AOT, based on risk-informed method analysis feasibility of extending AOT for EDG to 28 days, we quantitatively calculate the impact of extension of AOT on risk level of nuclear power plants (NPPs). Analysis shows that extension of EDG AOT to 28 days has less impact on NPPs, and safety of NPPs can be further ensured through temporary risk control measures, so the extension of AOT to 28 days is acceptable. By using risk-informed technology to extend AOT for EDG, unnecessary shutdown and maintenance is avoided and the economy of NPPs and flexibility of maintenance work arrangement is greatly improved while ensuring safety, which is of great significance to operation and maintenance of NPPs.http://dx.doi.org/10.1155/2023/8435835
spellingShingle Yunxin Feng
Wei Hu
Application of EDG AOT Extension Based on the Risk-Informed Method in NPPs
Science and Technology of Nuclear Installations
title Application of EDG AOT Extension Based on the Risk-Informed Method in NPPs
title_full Application of EDG AOT Extension Based on the Risk-Informed Method in NPPs
title_fullStr Application of EDG AOT Extension Based on the Risk-Informed Method in NPPs
title_full_unstemmed Application of EDG AOT Extension Based on the Risk-Informed Method in NPPs
title_short Application of EDG AOT Extension Based on the Risk-Informed Method in NPPs
title_sort application of edg aot extension based on the risk informed method in npps
url http://dx.doi.org/10.1155/2023/8435835
work_keys_str_mv AT yunxinfeng applicationofedgaotextensionbasedontheriskinformedmethodinnpps
AT weihu applicationofedgaotextensionbasedontheriskinformedmethodinnpps