Using safety system during the design phase to minimize waste in construction projects

Achieving construction projects (CPs) with minimal waste requires not only good construction planning, but also effective management for safety and waste of resources through the project cycle. The aim of this paper is to identify and rank safety factors (SF) during the design phase (DPh) of a proje...

Full description

Bibliographic Details
Main Authors: Kamal Mahfuth, Amara Loulizi, Bassam A. Tayeh, Khalid Al Hallaq, Yazan Issa Abu Aisheh
Format: Article
Language:English
Published: Elsevier 2022-03-01
Series:Journal of King Saud University: Engineering Sciences
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S1018363920302993
_version_ 1811280121895583744
author Kamal Mahfuth
Amara Loulizi
Bassam A. Tayeh
Khalid Al Hallaq
Yazan Issa Abu Aisheh
author_facet Kamal Mahfuth
Amara Loulizi
Bassam A. Tayeh
Khalid Al Hallaq
Yazan Issa Abu Aisheh
author_sort Kamal Mahfuth
collection DOAJ
description Achieving construction projects (CPs) with minimal waste requires not only good construction planning, but also effective management for safety and waste of resources through the project cycle. The aim of this paper is to identify and rank safety factors (SF) during the design phase (DPh) of a project that have positive effects in minimizing waste (cost, time and materials) during its construction. Data and information was gathered from available literature, structured interviews, and questionnaire conducted for 111 randomly selected construction organizations. Triangulation method to enhance the validity and reliability of the study findings was used. The research revealed 18 important SF that had positive effects on minimizing waste in CPs during the DPh. The five most important SF that should be considered to minimise waste are: capabilities and behaviour of the design team in the safety field, appropriateness of quantities and specifications for safety system (SS), appropriateness of foundation system for SS, appropriate public and special conditions for SS and appropriate electrical design for SS. The best linear model was developed on the basis of the importance index of the identified factors. A model was developed to minimize waste in CPs by using SS during the DPh. It is recommended that adequate attention must be given to safety criteria during DPh to minimize resources waste.
first_indexed 2024-04-13T01:07:48Z
format Article
id doaj.art-906a58c73e224122a90e41088c2aaead
institution Directory Open Access Journal
issn 1018-3639
language English
last_indexed 2024-04-13T01:07:48Z
publishDate 2022-03-01
publisher Elsevier
record_format Article
series Journal of King Saud University: Engineering Sciences
spelling doaj.art-906a58c73e224122a90e41088c2aaead2022-12-22T03:09:16ZengElsevierJournal of King Saud University: Engineering Sciences1018-36392022-03-01343170179Using safety system during the design phase to minimize waste in construction projectsKamal Mahfuth0Amara Loulizi1Bassam A. Tayeh2Khalid Al Hallaq3Yazan Issa Abu Aisheh4Civil Engineering Department, Faculty of Enginnering, Islamic University of Gaza, Gaza, PalestineCivil Engineering - Tunis El Manar University, Laboratory of Materials, Optimization, and Energy for Sustainability (LAMOED), B.P. 37 Le iBelvédère, 1002 Tunis, TunisiaCivil Engineering Department, Faculty of Enginnering, Islamic University of Gaza, Gaza, Palestine; Corresponding author.Civil Engineering Department, Faculty of Enginnering, Islamic University of Gaza, Gaza, PalestineCivil Engineering Department, Middle East University, JordanAchieving construction projects (CPs) with minimal waste requires not only good construction planning, but also effective management for safety and waste of resources through the project cycle. The aim of this paper is to identify and rank safety factors (SF) during the design phase (DPh) of a project that have positive effects in minimizing waste (cost, time and materials) during its construction. Data and information was gathered from available literature, structured interviews, and questionnaire conducted for 111 randomly selected construction organizations. Triangulation method to enhance the validity and reliability of the study findings was used. The research revealed 18 important SF that had positive effects on minimizing waste in CPs during the DPh. The five most important SF that should be considered to minimise waste are: capabilities and behaviour of the design team in the safety field, appropriateness of quantities and specifications for safety system (SS), appropriateness of foundation system for SS, appropriate public and special conditions for SS and appropriate electrical design for SS. The best linear model was developed on the basis of the importance index of the identified factors. A model was developed to minimize waste in CPs by using SS during the DPh. It is recommended that adequate attention must be given to safety criteria during DPh to minimize resources waste.http://www.sciencedirect.com/science/article/pii/S1018363920302993ConstructionWasteDesign phaseSafetySafety system
spellingShingle Kamal Mahfuth
Amara Loulizi
Bassam A. Tayeh
Khalid Al Hallaq
Yazan Issa Abu Aisheh
Using safety system during the design phase to minimize waste in construction projects
Journal of King Saud University: Engineering Sciences
Construction
Waste
Design phase
Safety
Safety system
title Using safety system during the design phase to minimize waste in construction projects
title_full Using safety system during the design phase to minimize waste in construction projects
title_fullStr Using safety system during the design phase to minimize waste in construction projects
title_full_unstemmed Using safety system during the design phase to minimize waste in construction projects
title_short Using safety system during the design phase to minimize waste in construction projects
title_sort using safety system during the design phase to minimize waste in construction projects
topic Construction
Waste
Design phase
Safety
Safety system
url http://www.sciencedirect.com/science/article/pii/S1018363920302993
work_keys_str_mv AT kamalmahfuth usingsafetysystemduringthedesignphasetominimizewasteinconstructionprojects
AT amaraloulizi usingsafetysystemduringthedesignphasetominimizewasteinconstructionprojects
AT bassamatayeh usingsafetysystemduringthedesignphasetominimizewasteinconstructionprojects
AT khalidalhallaq usingsafetysystemduringthedesignphasetominimizewasteinconstructionprojects
AT yazanissaabuaisheh usingsafetysystemduringthedesignphasetominimizewasteinconstructionprojects