Exact and Heuristic Procedures for the Two-Center Hybrid Flow Shop Scheduling Problem With Transportation Times
This paper addresses the two centers hybrid flow shop scheduling problem with transportation times. This problem is faced in several real-world applications. The considered objective function to be minimized in this problem is the maximum completion time. This scheduling problem is NP-hard, and most...
Main Authors: | Lotfi Hidri, Sabeur Elkosantini, Mohammed M. Mabkhot |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2018-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/8336873/ |
Similar Items
-
Multi-stage hybrid flow shop scheduling problem with lag, unloading, and transportation times
by: Lotfi Hidri, et al.
Published: (2024-08-01) -
New Efficient Lower Bound for the Hybrid Flow Shop Scheduling Problem With Multiprocessor Tasks
by: Lotfi Hidri, et al.
Published: (2017-01-01) -
A Computational Study of the Two-Machine No-Wait Flow Shop Scheduling Problem Subject to Unequal Release Dates and Non-Availability Constraints
by: Mohamed Labidi, et al.
Published: (2018-01-01) -
Flow Shop Scheduling with Shortening Jobs for Makespan Minimization
by: Zheng-Wei Sun, et al.
Published: (2025-01-01) -
A branch-and-bound method to minimize the makespan in a permutation flow shop with blocking and setup times
by: Mauricio Iwama Takano, et al.
Published: (2017-01-01)