Influence of initial operating conditions on technological function parameters of servicing systems - machines and devices

In warehousing and production systems, every device or machine re-commissioning after malfunction or at the start of a new shift, leads to their non-stationary operating regime caused by a certain number of residual unprocessed units. In warehouse systems, non-stationary operating regime is common w...

Full description

Bibliographic Details
Main Authors: Ugljesa Bugaric, Milan Vugdelija, Dusan Petrovic, Dusan Glisic, Zoran Petrovic
Format: Article
Language:English
Published: Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek 2017-01-01
Series:Tehnički Vjesnik
Subjects:
Online Access:https://hrcak.srce.hr/file/257844
_version_ 1827283096790106112
author Ugljesa Bugaric
Milan Vugdelija
Dusan Petrovic
Dusan Glisic
Zoran Petrovic
author_facet Ugljesa Bugaric
Milan Vugdelija
Dusan Petrovic
Dusan Glisic
Zoran Petrovic
author_sort Ugljesa Bugaric
collection DOAJ
description In warehousing and production systems, every device or machine re-commissioning after malfunction or at the start of a new shift, leads to their non-stationary operating regime caused by a certain number of residual unprocessed units. In warehouse systems, non-stationary operating regime is common when palletized goods are stored in one (two) shifts while their production runs in two (three) shifts. Such situations influence technological function parameters (TFPs) of production or warehousing systems. On the other hand, non-stationary operating regime of a single device or machine may be modelled as a single server servicing system with a finite waiting room – M/M/1/K. As a result, general analytical integration constants expression was derived based on initial arbitrary system state probability values. Influence of initial non-stationary operating regime and its duration on warehousing system TFPs is evaluated in view of the operating conditions of an existing high bay pallet warehouse.
first_indexed 2024-04-24T09:30:03Z
format Article
id doaj.art-918ecd4cca924c6dbb36f13c3a57b539
institution Directory Open Access Journal
issn 1330-3651
1848-6339
language English
last_indexed 2024-04-24T09:30:03Z
publishDate 2017-01-01
publisher Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek
record_format Article
series Tehnički Vjesnik
spelling doaj.art-918ecd4cca924c6dbb36f13c3a57b5392024-04-15T14:01:41ZengFaculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in OsijekTehnički Vjesnik1330-36511848-63392017-01-0124111912810.17559/TV-20150218134949Influence of initial operating conditions on technological function parameters of servicing systems - machines and devicesUgljesa Bugaric0Milan Vugdelija1Dusan Petrovic2Dusan Glisic3Zoran Petrovic4University of Belgrade, Faculty of Mechanical Engineering, Kraljice Marije 16, 11120 Belgrade 35, SerbiaMicrosoft Development Center Serbia, Španskih boraca 3/3, 11070 Belgrade, SerbiaUniversity of Belgrade, Faculty of Mechanical Engineering, Kraljice Marije 16, 11120 Belgrade 35, SerbiaCyberdine Systems, Molerova 35A, 11000 Belgrade, SerbiaTecon sistem d.o.o., Serbia, Antifašističke borbe 21b, 11070 Belgrade, SerbiaIn warehousing and production systems, every device or machine re-commissioning after malfunction or at the start of a new shift, leads to their non-stationary operating regime caused by a certain number of residual unprocessed units. In warehouse systems, non-stationary operating regime is common when palletized goods are stored in one (two) shifts while their production runs in two (three) shifts. Such situations influence technological function parameters (TFPs) of production or warehousing systems. On the other hand, non-stationary operating regime of a single device or machine may be modelled as a single server servicing system with a finite waiting room – M/M/1/K. As a result, general analytical integration constants expression was derived based on initial arbitrary system state probability values. Influence of initial non-stationary operating regime and its duration on warehousing system TFPs is evaluated in view of the operating conditions of an existing high bay pallet warehouse.https://hrcak.srce.hr/file/257844M/M/1/Koperating cycleproductiontransient probabilitieswarehousing
spellingShingle Ugljesa Bugaric
Milan Vugdelija
Dusan Petrovic
Dusan Glisic
Zoran Petrovic
Influence of initial operating conditions on technological function parameters of servicing systems - machines and devices
Tehnički Vjesnik
M/M/1/K
operating cycle
production
transient probabilities
warehousing
title Influence of initial operating conditions on technological function parameters of servicing systems - machines and devices
title_full Influence of initial operating conditions on technological function parameters of servicing systems - machines and devices
title_fullStr Influence of initial operating conditions on technological function parameters of servicing systems - machines and devices
title_full_unstemmed Influence of initial operating conditions on technological function parameters of servicing systems - machines and devices
title_short Influence of initial operating conditions on technological function parameters of servicing systems - machines and devices
title_sort influence of initial operating conditions on technological function parameters of servicing systems machines and devices
topic M/M/1/K
operating cycle
production
transient probabilities
warehousing
url https://hrcak.srce.hr/file/257844
work_keys_str_mv AT ugljesabugaric influenceofinitialoperatingconditionsontechnologicalfunctionparametersofservicingsystemsmachinesanddevices
AT milanvugdelija influenceofinitialoperatingconditionsontechnologicalfunctionparametersofservicingsystemsmachinesanddevices
AT dusanpetrovic influenceofinitialoperatingconditionsontechnologicalfunctionparametersofservicingsystemsmachinesanddevices
AT dusanglisic influenceofinitialoperatingconditionsontechnologicalfunctionparametersofservicingsystemsmachinesanddevices
AT zoranpetrovic influenceofinitialoperatingconditionsontechnologicalfunctionparametersofservicingsystemsmachinesanddevices