Influence of initial operating conditions on technological function parameters of servicing systems - machines and devices
In warehousing and production systems, every device or machine re-commissioning after malfunction or at the start of a new shift, leads to their non-stationary operating regime caused by a certain number of residual unprocessed units. In warehouse systems, non-stationary operating regime is common w...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek
2017-01-01
|
Series: | Tehnički Vjesnik |
Subjects: | |
Online Access: | https://hrcak.srce.hr/file/257844 |
_version_ | 1827283096790106112 |
---|---|
author | Ugljesa Bugaric Milan Vugdelija Dusan Petrovic Dusan Glisic Zoran Petrovic |
author_facet | Ugljesa Bugaric Milan Vugdelija Dusan Petrovic Dusan Glisic Zoran Petrovic |
author_sort | Ugljesa Bugaric |
collection | DOAJ |
description | In warehousing and production systems, every device or machine re-commissioning after malfunction or at the start of a new shift, leads to their non-stationary operating regime caused by a certain number of residual unprocessed units. In warehouse systems, non-stationary operating regime is common when palletized goods are stored in one (two) shifts while their production runs in two (three) shifts. Such situations influence technological function parameters (TFPs) of production or warehousing systems. On the other hand, non-stationary operating regime of a single device or machine may be modelled as a single server servicing system with a finite waiting room – M/M/1/K. As a result, general analytical integration constants expression was derived based on initial arbitrary system state probability values. Influence of initial non-stationary operating regime and its duration on warehousing system TFPs is evaluated in view of the operating conditions of an existing high bay pallet warehouse. |
first_indexed | 2024-04-24T09:30:03Z |
format | Article |
id | doaj.art-918ecd4cca924c6dbb36f13c3a57b539 |
institution | Directory Open Access Journal |
issn | 1330-3651 1848-6339 |
language | English |
last_indexed | 2024-04-24T09:30:03Z |
publishDate | 2017-01-01 |
publisher | Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek |
record_format | Article |
series | Tehnički Vjesnik |
spelling | doaj.art-918ecd4cca924c6dbb36f13c3a57b5392024-04-15T14:01:41ZengFaculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in OsijekTehnički Vjesnik1330-36511848-63392017-01-0124111912810.17559/TV-20150218134949Influence of initial operating conditions on technological function parameters of servicing systems - machines and devicesUgljesa Bugaric0Milan Vugdelija1Dusan Petrovic2Dusan Glisic3Zoran Petrovic4University of Belgrade, Faculty of Mechanical Engineering, Kraljice Marije 16, 11120 Belgrade 35, SerbiaMicrosoft Development Center Serbia, Španskih boraca 3/3, 11070 Belgrade, SerbiaUniversity of Belgrade, Faculty of Mechanical Engineering, Kraljice Marije 16, 11120 Belgrade 35, SerbiaCyberdine Systems, Molerova 35A, 11000 Belgrade, SerbiaTecon sistem d.o.o., Serbia, Antifašističke borbe 21b, 11070 Belgrade, SerbiaIn warehousing and production systems, every device or machine re-commissioning after malfunction or at the start of a new shift, leads to their non-stationary operating regime caused by a certain number of residual unprocessed units. In warehouse systems, non-stationary operating regime is common when palletized goods are stored in one (two) shifts while their production runs in two (three) shifts. Such situations influence technological function parameters (TFPs) of production or warehousing systems. On the other hand, non-stationary operating regime of a single device or machine may be modelled as a single server servicing system with a finite waiting room – M/M/1/K. As a result, general analytical integration constants expression was derived based on initial arbitrary system state probability values. Influence of initial non-stationary operating regime and its duration on warehousing system TFPs is evaluated in view of the operating conditions of an existing high bay pallet warehouse.https://hrcak.srce.hr/file/257844M/M/1/Koperating cycleproductiontransient probabilitieswarehousing |
spellingShingle | Ugljesa Bugaric Milan Vugdelija Dusan Petrovic Dusan Glisic Zoran Petrovic Influence of initial operating conditions on technological function parameters of servicing systems - machines and devices Tehnički Vjesnik M/M/1/K operating cycle production transient probabilities warehousing |
title | Influence of initial operating conditions on technological function parameters of servicing systems - machines and devices |
title_full | Influence of initial operating conditions on technological function parameters of servicing systems - machines and devices |
title_fullStr | Influence of initial operating conditions on technological function parameters of servicing systems - machines and devices |
title_full_unstemmed | Influence of initial operating conditions on technological function parameters of servicing systems - machines and devices |
title_short | Influence of initial operating conditions on technological function parameters of servicing systems - machines and devices |
title_sort | influence of initial operating conditions on technological function parameters of servicing systems machines and devices |
topic | M/M/1/K operating cycle production transient probabilities warehousing |
url | https://hrcak.srce.hr/file/257844 |
work_keys_str_mv | AT ugljesabugaric influenceofinitialoperatingconditionsontechnologicalfunctionparametersofservicingsystemsmachinesanddevices AT milanvugdelija influenceofinitialoperatingconditionsontechnologicalfunctionparametersofservicingsystemsmachinesanddevices AT dusanpetrovic influenceofinitialoperatingconditionsontechnologicalfunctionparametersofservicingsystemsmachinesanddevices AT dusanglisic influenceofinitialoperatingconditionsontechnologicalfunctionparametersofservicingsystemsmachinesanddevices AT zoranpetrovic influenceofinitialoperatingconditionsontechnologicalfunctionparametersofservicingsystemsmachinesanddevices |