Evaluating Production Time Buffer for Precast Fabrication
Precast fabricators strive for business success in delivering products on time. To achieve this goal, fabricators start manufacturing once they receive specific design information. However, this strategy induces wasteful inventory. The objective of this study is to develop a Time Buffer Evaluation M...
Main Authors: | Chien-Ho Ko, Yu-Chun Chen |
---|---|
Format: | Article |
Language: | English |
Published: |
Engineering, Project, and Production Management (EPPM)
2012-07-01
|
Series: | Journal of Engineering, Project, and Production Management |
Subjects: | |
Online Access: | http://www.ppml.url.tw/EPPM_Journal/volumns/02_02_July_2012/ID_022_2_2_101_111.pdf |
Similar Items
-
Material transshipment for precast fabrication
by: Chien-Ho Ko
Published: (2013-06-01) -
Buffering policies for prefabricated construction supply chain subject to material lead time and activity duration uncertainties
by: Hui Lu, et al.
Published: (2024-02-01) -
Precast concrete production/
by: 398607 Richardson, John George
Published: (1973) -
RESEARCHES ON PRECAST STRUCTURES /
by: Tan, Cher Siang, 1979-, editor, et al.
Published: (2017) -
Quality in precast concrete : design-production-supervision/
by: 398607 Richardson, John George
Published: (1991)