Validation of improvement in changeover of die bond process using basicmost technique

According to the lean manufacturing philosophy, productivity can be boosted via work and time measurement techniques by establishing suitable standard time and work methods. Standard is a level or grade that can be used as a measure for comparative evaluation as a benchmark. It is developed and do...

Full description

Bibliographic Details
Main Authors: Puvanasvaran A. Perumal, Karmegam Karuppiah, Lim Eu Sheng
Format: Article
Language:English
Published: Prince of Songkla University 2021-10-01
Series:Songklanakarin Journal of Science and Technology (SJST)
Subjects:
Online Access:https://rdo.psu.ac.th/sjst/journal/43-5/9.pdf
_version_ 1818015167103893504
author Puvanasvaran A. Perumal
Karmegam Karuppiah
Lim Eu Sheng
author_facet Puvanasvaran A. Perumal
Karmegam Karuppiah
Lim Eu Sheng
author_sort Puvanasvaran A. Perumal
collection DOAJ
description According to the lean manufacturing philosophy, productivity can be boosted via work and time measurement techniques by establishing suitable standard time and work methods. Standard is a level or grade that can be used as a measure for comparative evaluation as a benchmark. It is developed and documented for many evaluations. For the case study, a standard time was developed for the changeover process in die bond, which is a process in the semiconductor company. The standard time was developed for the new improved work elements of changeover process in the company. The work elements in the changeover process were first identified and established. Normal time, a value needed to calculate standard time was obtained by two work measurements namely stopwatch time study and BasicMOST. The non-value-added activities and their respective time in the changeover was identified via the synergy of data from both work measurements with the integration of both quantitative, comparison of normal time and qualitative analysis. In a flow process chart 7 out of 18 work elements were classified as transport activity, which was taken as non-value-added activity, and these took up 39 percent of the changeover time. A total of 7.56 seconds was then excluded from the standard time. The standard time was calculated to be 22.91 minutes using BasicMOST. Since there was only a minor difference in times, less than 27.84 seconds from BasicMOST, the standard time was based on BasicMOST, and the improved work procedures have been validated as effective.
first_indexed 2024-04-14T06:53:29Z
format Article
id doaj.art-91c36c35dea44479b96887461eb73170
institution Directory Open Access Journal
issn 0125-3395
language English
last_indexed 2024-04-14T06:53:29Z
publishDate 2021-10-01
publisher Prince of Songkla University
record_format Article
series Songklanakarin Journal of Science and Technology (SJST)
spelling doaj.art-91c36c35dea44479b96887461eb731702022-12-22T02:06:57ZengPrince of Songkla UniversitySongklanakarin Journal of Science and Technology (SJST)0125-33952021-10-014351299130410.14456/sjst-psu.2021.169Validation of improvement in changeover of die bond process using basicmost techniquePuvanasvaran A. Perumal0Karmegam Karuppiah1Lim Eu Sheng2Faculty of Manufacturing Engineering, Universiti Teknikal Malaysia Melaka, Hang Tuah Jaya, Durian Tunggal, Melaka, 76100 MalaysiaDepartment of Environmental and Occupational Health, Faculty of Medicine and Health Sciences, Universiti Putra Malaysia, Serdang, Selangor, 43400 MalaysiaFaculty of Manufacturing Engineering, Universiti Teknikal Malaysia Melaka, Hang Tuah Jaya, Durian Tunggal, Melaka, 76100 MalaysiaAccording to the lean manufacturing philosophy, productivity can be boosted via work and time measurement techniques by establishing suitable standard time and work methods. Standard is a level or grade that can be used as a measure for comparative evaluation as a benchmark. It is developed and documented for many evaluations. For the case study, a standard time was developed for the changeover process in die bond, which is a process in the semiconductor company. The standard time was developed for the new improved work elements of changeover process in the company. The work elements in the changeover process were first identified and established. Normal time, a value needed to calculate standard time was obtained by two work measurements namely stopwatch time study and BasicMOST. The non-value-added activities and their respective time in the changeover was identified via the synergy of data from both work measurements with the integration of both quantitative, comparison of normal time and qualitative analysis. In a flow process chart 7 out of 18 work elements were classified as transport activity, which was taken as non-value-added activity, and these took up 39 percent of the changeover time. A total of 7.56 seconds was then excluded from the standard time. The standard time was calculated to be 22.91 minutes using BasicMOST. Since there was only a minor difference in times, less than 27.84 seconds from BasicMOST, the standard time was based on BasicMOST, and the improved work procedures have been validated as effective.https://rdo.psu.ac.th/sjst/journal/43-5/9.pdfstandard timework measurementsmaynard’s operation sequence technique (most)basicmoststopwatch time study
spellingShingle Puvanasvaran A. Perumal
Karmegam Karuppiah
Lim Eu Sheng
Validation of improvement in changeover of die bond process using basicmost technique
Songklanakarin Journal of Science and Technology (SJST)
standard time
work measurements
maynard’s operation sequence technique (most)
basicmost
stopwatch time study
title Validation of improvement in changeover of die bond process using basicmost technique
title_full Validation of improvement in changeover of die bond process using basicmost technique
title_fullStr Validation of improvement in changeover of die bond process using basicmost technique
title_full_unstemmed Validation of improvement in changeover of die bond process using basicmost technique
title_short Validation of improvement in changeover of die bond process using basicmost technique
title_sort validation of improvement in changeover of die bond process using basicmost technique
topic standard time
work measurements
maynard’s operation sequence technique (most)
basicmost
stopwatch time study
url https://rdo.psu.ac.th/sjst/journal/43-5/9.pdf
work_keys_str_mv AT puvanasvaranaperumal validationofimprovementinchangeoverofdiebondprocessusingbasicmosttechnique
AT karmegamkaruppiah validationofimprovementinchangeoverofdiebondprocessusingbasicmosttechnique
AT limeusheng validationofimprovementinchangeoverofdiebondprocessusingbasicmosttechnique