Integrated scheduling of distributed production and distribution in group manufacturing with uncertain travel time
Abstract This paper presents a novel integrated distributed production and distribution scheduling problem in group manufacturing with uncertain travel time (IDPDSP-GM-UTT), in which products are firstly produced in several distributed hybrid flow shops and then delivered to several retailers in bat...
Main Authors: | Jun Guo, Wenjun Liu, Zhao Peng, Baigang Du |
---|---|
Format: | Article |
Language: | English |
Published: |
Springer
2022-10-01
|
Series: | Complex & Intelligent Systems |
Subjects: | |
Online Access: | https://doi.org/10.1007/s40747-022-00875-7 |
Similar Items
-
Research on Production Scheduling Technology in Knitting Workshop Based on Improved Genetic Algorithm
by: Lei Sun, et al.
Published: (2023-05-01) -
Research on the scheduling method of ground resource under uncertain arrival time
by: Guoning Xu, et al.
Published: (2023-12-01) -
Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm
by: Nuntana Mayteekrieangkrai, et al.
Published: (2015-04-01) -
Modeling Uncertain Travel Times in Distribution Logistics
by: Khadija Ait Mamoun, et al.
Published: (2023-10-01) -
An application of metaheuristic optimization algorithms for solving the flexible job-shop scheduling problem
by: Aleksandar Stanković, et al.
Published: (2020-09-01)