Selib 1. preliminary report for the 2012 and 2013 seasons
Part of a lower building was uncovered during the third and fourth seasons of excavationat the site of a church in Selib 1. Finds from the fill between floors confirmed the early dating ofthe oldest church (6th/7th century). Two buildings were examined in the vicinity of the innerperibolos: BN.13, w...
Main Author: | |
---|---|
Format: | Article |
Language: | deu |
Published: |
University of Warsaw Press
2016-02-01
|
Series: | Polish Archaeology in the Mediterranean |
Subjects: | |
Online Access: | http://pam-journal.pl/gicid/01.3001.0010.0065 |
Summary: | Part of a lower building was uncovered during the third and fourth seasons of excavationat the site of a church in Selib 1. Finds from the fill between floors confirmed the early dating ofthe oldest church (6th/7th century). Two buildings were examined in the vicinity of the innerperibolos: BN.13, which proved to be a domestic dwelling from a later phase (11th–12th century),and BS.13, identified as a structure of religious function built before the 9th–10th century. |
---|---|
ISSN: | 1234-5415 2083-537X |