Closure Scheme Analysis of 3 × 70 m Bearingless Integral Rigid Frame Bridge of Fuzhou Xiamen High-Speed Railway

The hydrodynamic problems associated with the construction of the sea-crossing bridge were proposed. The deep-water approach bridge on both sides of the main bridge of Fuzhou Xiamen high-speed railway adopts the bearingless prestressed concrete integral rigid frame bridge for the first time in the d...

Full description

Bibliographic Details
Main Authors: Fangwen Weng, Xiangui Li
Format: Article
Language:English
Published: Hindawi Limited 2023-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2023/6357539
_version_ 1797850980730011648
author Fangwen Weng
Xiangui Li
author_facet Fangwen Weng
Xiangui Li
author_sort Fangwen Weng
collection DOAJ
description The hydrodynamic problems associated with the construction of the sea-crossing bridge were proposed. The deep-water approach bridge on both sides of the main bridge of Fuzhou Xiamen high-speed railway adopts the bearingless prestressed concrete integral rigid frame bridge for the first time in the domestic railway bridge design. The rigid frame bridge applies the hanging basket cantilever construction, and there are several options for closure. Because the bridge structure system changes before and after closure, which will cause the redistribution of bridge internal force, the results of internal force redistribution will be different with the sequence and position of closure, and sometimes, there will be great changes. In order to select the optimal closure scheme, this article establishes the finite element model of the whole bridge and analyzes the whole construction process according to the working conditions and the mechanical state of the bridge before closure is obtained. Based on this state, eight closure schemes are analyzed and studied, which provides a sufficient mechanical basis for the determination of the final closure construction scheme.
first_indexed 2024-04-09T19:10:21Z
format Article
id doaj.art-9317c39447d64c8a9192824bd5e1b162
institution Directory Open Access Journal
issn 1687-8094
language English
last_indexed 2024-04-09T19:10:21Z
publishDate 2023-01-01
publisher Hindawi Limited
record_format Article
series Advances in Civil Engineering
spelling doaj.art-9317c39447d64c8a9192824bd5e1b1622023-04-07T00:00:11ZengHindawi LimitedAdvances in Civil Engineering1687-80942023-01-01202310.1155/2023/6357539Closure Scheme Analysis of 3 × 70 m Bearingless Integral Rigid Frame Bridge of Fuzhou Xiamen High-Speed RailwayFangwen Weng0Xiangui Li1CCCC Second Harbor Engineering Company Ltd.Southeast Coastal Railway Fujian Company Ltd.The hydrodynamic problems associated with the construction of the sea-crossing bridge were proposed. The deep-water approach bridge on both sides of the main bridge of Fuzhou Xiamen high-speed railway adopts the bearingless prestressed concrete integral rigid frame bridge for the first time in the domestic railway bridge design. The rigid frame bridge applies the hanging basket cantilever construction, and there are several options for closure. Because the bridge structure system changes before and after closure, which will cause the redistribution of bridge internal force, the results of internal force redistribution will be different with the sequence and position of closure, and sometimes, there will be great changes. In order to select the optimal closure scheme, this article establishes the finite element model of the whole bridge and analyzes the whole construction process according to the working conditions and the mechanical state of the bridge before closure is obtained. Based on this state, eight closure schemes are analyzed and studied, which provides a sufficient mechanical basis for the determination of the final closure construction scheme.http://dx.doi.org/10.1155/2023/6357539
spellingShingle Fangwen Weng
Xiangui Li
Closure Scheme Analysis of 3 × 70 m Bearingless Integral Rigid Frame Bridge of Fuzhou Xiamen High-Speed Railway
Advances in Civil Engineering
title Closure Scheme Analysis of 3 × 70 m Bearingless Integral Rigid Frame Bridge of Fuzhou Xiamen High-Speed Railway
title_full Closure Scheme Analysis of 3 × 70 m Bearingless Integral Rigid Frame Bridge of Fuzhou Xiamen High-Speed Railway
title_fullStr Closure Scheme Analysis of 3 × 70 m Bearingless Integral Rigid Frame Bridge of Fuzhou Xiamen High-Speed Railway
title_full_unstemmed Closure Scheme Analysis of 3 × 70 m Bearingless Integral Rigid Frame Bridge of Fuzhou Xiamen High-Speed Railway
title_short Closure Scheme Analysis of 3 × 70 m Bearingless Integral Rigid Frame Bridge of Fuzhou Xiamen High-Speed Railway
title_sort closure scheme analysis of 3 70 m bearingless integral rigid frame bridge of fuzhou xiamen high speed railway
url http://dx.doi.org/10.1155/2023/6357539
work_keys_str_mv AT fangwenweng closureschemeanalysisof370mbearinglessintegralrigidframebridgeoffuzhouxiamenhighspeedrailway
AT xianguili closureschemeanalysisof370mbearinglessintegralrigidframebridgeoffuzhouxiamenhighspeedrailway