Closure Scheme Analysis of 3 × 70 m Bearingless Integral Rigid Frame Bridge of Fuzhou Xiamen High-Speed Railway

The hydrodynamic problems associated with the construction of the sea-crossing bridge were proposed. The deep-water approach bridge on both sides of the main bridge of Fuzhou Xiamen high-speed railway adopts the bearingless prestressed concrete integral rigid frame bridge for the first time in the d...

Full description

Bibliographic Details
Main Authors: Fangwen Weng, Xiangui Li
Format: Article
Language:English
Published: Hindawi Limited 2023-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2023/6357539