Analysis and estimation of the risk of erosion by using the BSTEM model in the Kawtar River Basin

The rivers have been known from the past to this day as the most populous areas of the planet. The expansion of urbanization and the increase of human needs have created a balance between rivers and disruptions in the river system. One of the most important river hazards is the erosion of the river...

Full description

Bibliographic Details
Main Authors: Mehdi Feyzolahpour, Khalegh Ahmadi
Format: Article
Language:fas
Published: University of Sistan and Baluchestan 2019-09-01
Series:مخاطرات محیط طبیعی
Subjects:
Online Access:https://jneh.usb.ac.ir/article_3874_43a6426050e3de4db2162aaeff8d234d.pdf
_version_ 1797805303560929280
author Mehdi Feyzolahpour
Khalegh Ahmadi
author_facet Mehdi Feyzolahpour
Khalegh Ahmadi
author_sort Mehdi Feyzolahpour
collection DOAJ
description The rivers have been known from the past to this day as the most populous areas of the planet. The expansion of urbanization and the increase of human needs have created a balance between rivers and disruptions in the river system. One of the most important river hazards is the erosion of the river bank. It causes many economic, social and environmental damages every year. The present research is based on fieldwork and modeling of erosion of the river Bank. Therefore, it seeks to identify sensitive areas of the Bank erosion and estimate the extent of erosion. For this purpose, the NBS index and BSTEM model has been used to identify and estimate the erosion of the Kwtar River in Mahabad. A route of 3 km was selected from the Kwtar River. Morphological characteristics of five cross sections for NBS index and three intervals for BSTEM model were taken. Rosgen’s proposed seven parameters for assessing the near bank stress (NBS) index. In this research, three parameters were used for the estimation of bank erosion. Two parameters and the highest efficiency in the identification of river bank erosion was cauterized. While the parameter was somewhat contradictory to reality. Then using the BSTEM model, simulation of normal and flood flow and its consequences on the Toe Erosion and Bank Stability were studied. The BSTEM model evaluates the stability of the edges with the safety factor (FS). The main cause of the erosion of the Toe is due to hydraulic currents and the main cause of instability and fracture failure due to the geotechnical characteristics and the underlying hydraulic flow along the sides Toe Bank of the Kawtar River. As the rate increased, the amount of foot erosion and the fracture failure rate were increased.
first_indexed 2024-03-13T05:49:00Z
format Article
id doaj.art-935e53fade6b4ce2b5cdb71f357ff68c
institution Directory Open Access Journal
issn 2676-4377
2676-4385
language fas
last_indexed 2024-03-13T05:49:00Z
publishDate 2019-09-01
publisher University of Sistan and Baluchestan
record_format Article
series مخاطرات محیط طبیعی
spelling doaj.art-935e53fade6b4ce2b5cdb71f357ff68c2023-06-13T19:55:02ZfasUniversity of Sistan and Baluchestanمخاطرات محیط طبیعی2676-43772676-43852019-09-01821416010.22111/jneh.2018.21872.13133874Analysis and estimation of the risk of erosion by using the BSTEM model in the Kawtar River BasinMehdi Feyzolahpour0Khalegh Ahmadi1Assistant Professor of Geography Faculty of Human Sciences, University of Zanjan, Zanjan, IranMA Student of Geomorphology, Faculty of Human Sciences, University of Zanjan, Zanjan, IranThe rivers have been known from the past to this day as the most populous areas of the planet. The expansion of urbanization and the increase of human needs have created a balance between rivers and disruptions in the river system. One of the most important river hazards is the erosion of the river bank. It causes many economic, social and environmental damages every year. The present research is based on fieldwork and modeling of erosion of the river Bank. Therefore, it seeks to identify sensitive areas of the Bank erosion and estimate the extent of erosion. For this purpose, the NBS index and BSTEM model has been used to identify and estimate the erosion of the Kwtar River in Mahabad. A route of 3 km was selected from the Kwtar River. Morphological characteristics of five cross sections for NBS index and three intervals for BSTEM model were taken. Rosgen’s proposed seven parameters for assessing the near bank stress (NBS) index. In this research, three parameters were used for the estimation of bank erosion. Two parameters and the highest efficiency in the identification of river bank erosion was cauterized. While the parameter was somewhat contradictory to reality. Then using the BSTEM model, simulation of normal and flood flow and its consequences on the Toe Erosion and Bank Stability were studied. The BSTEM model evaluates the stability of the edges with the safety factor (FS). The main cause of the erosion of the Toe is due to hydraulic currents and the main cause of instability and fracture failure due to the geotechnical characteristics and the underlying hydraulic flow along the sides Toe Bank of the Kawtar River. As the rate increased, the amount of foot erosion and the fracture failure rate were increased.https://jneh.usb.ac.ir/article_3874_43a6426050e3de4db2162aaeff8d234d.pdfevaluation of the bank stability and toe erosion modelshear stressfactor of safetybstemkutter river
spellingShingle Mehdi Feyzolahpour
Khalegh Ahmadi
Analysis and estimation of the risk of erosion by using the BSTEM model in the Kawtar River Basin
مخاطرات محیط طبیعی
evaluation of the bank stability and toe erosion model
shear stress
factor of safety
bstem
kutter river
title Analysis and estimation of the risk of erosion by using the BSTEM model in the Kawtar River Basin
title_full Analysis and estimation of the risk of erosion by using the BSTEM model in the Kawtar River Basin
title_fullStr Analysis and estimation of the risk of erosion by using the BSTEM model in the Kawtar River Basin
title_full_unstemmed Analysis and estimation of the risk of erosion by using the BSTEM model in the Kawtar River Basin
title_short Analysis and estimation of the risk of erosion by using the BSTEM model in the Kawtar River Basin
title_sort analysis and estimation of the risk of erosion by using the bstem model in the kawtar river basin
topic evaluation of the bank stability and toe erosion model
shear stress
factor of safety
bstem
kutter river
url https://jneh.usb.ac.ir/article_3874_43a6426050e3de4db2162aaeff8d234d.pdf
work_keys_str_mv AT mehdifeyzolahpour analysisandestimationoftheriskoferosionbyusingthebstemmodelinthekawtarriverbasin
AT khaleghahmadi analysisandestimationoftheriskoferosionbyusingthebstemmodelinthekawtarriverbasin