Dynamic optimization of open-pit coal mine production scheduling based on ARIMA and fuzzy structured element
A dynamic optimization method was created to address the production schedule issue in an open-pit coal mine while taking into account the characteristics of the fuzzy structured element. The fuzzy mining capacities of all “geologically optimal push-back bodies” were then examined using the moving co...
Main Authors: | Guangwei Liu, Weiqiang Guo, Ensan Fu, Chuanda Yang, Jiaming Li |
---|---|
Format: | Article |
Language: | English |
Published: |
Frontiers Media S.A.
2023-01-01
|
Series: | Frontiers in Earth Science |
Subjects: | |
Online Access: | https://www.frontiersin.org/articles/10.3389/feart.2022.1040464/full |
Similar Items
-
Optimization of working slope configuration in seasonal operations of cold regions open-pit mine
by: Guangwei Liu, et al.
Published: (2024-01-01) -
Evaluation of reclamation in Hequ open-pit coal mine dump: soil fertility restoration model
by: ZHAO Hongbao, et al.
Published: (2024-02-01) -
Truck Selection with the Fuzzy-WSM Method in Transportation Systems of Open Pit Mines
by: Tahir Malli, et al.
Published: (2021-01-01) -
Research on mining plan of non-working high-level coal seam in open-pit mine with near-horizontal composite coal seam
by: Bo CAO, et al.
Published: (2023-08-01) -
Selection of coal transportation mode from the open pit mine to the thermic power plant using Fuzzy Analytic Hierarchy Process
by: Pinar Mizrak Özfirat, et al.
Published: (2018-01-01)