Modified Meyerhof approach for forecasting reliable ultimate capacity of the large diameter bored piles
Abstract The static loading test is undoubtedly the most reliable method for forecasting the ultimate capacity of the large diameter bored piles (LDBP). However, in-situ loading of this class of piles until reaching failure is practically seldom due to the large amount of settlement required for sha...
Main Authors: | M. E. Al-Atroush, A. M. Hefny, T. M. Sorour |
---|---|
Format: | Article |
Language: | English |
Published: |
Nature Portfolio
2022-05-01
|
Series: | Scientific Reports |
Online Access: | https://doi.org/10.1038/s41598-022-12238-w |
Similar Items
-
Behavior of a Large Diameter Bored Pile in Drained and Undrained Conditions: Comparative Analysis
by: Mohamed Ezzat Al-Atroush, et al.
Published: (2020-07-01) -
Improvement on performances of large diameter bored piles
by: Ang, Paul Thien Cheong
Published: (2008) -
Experimental Study on Post Grouting Bearing Capacity of Large Diameter Bored Piles
by: Wang Duanduan, et al.
Published: (2015-01-01) -
Prediction of ultimate bored pile capacity using global strain extensometer
by: Badrun, Mohd. Zahrullail
Published: (2011) -
Prediction of ultimate bored pile capacity using global strain extensometer /
by: Mohd. Zahrullail Badrun, 1971-, et al.
Published: (2011)