Stakeholder identification methods used in private organisations’ projects in Nigeria
Purpose – The purpose of the study is to examine the stakeholder identification (SI) methods used in building projects procured by private corporate organisations in Southwestern Nigeria to draw a correlation between methods used for SI and project performance in the study area, thereby enhancing pr...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Emerald Publishing
2021-12-01
|
Series: | Frontiers in Engineering and Built Environment |
Subjects: | |
Online Access: | https://www.emerald.com/insight/content/doi/10.1108/FEBE-05-2021-0023/full/pdf |
_version_ | 1797786236718415872 |
---|---|
author | Nathaniel Ayinde Olatunde Imoleayo Abraham Awodele Henry Agboola Odeyinka |
author_facet | Nathaniel Ayinde Olatunde Imoleayo Abraham Awodele Henry Agboola Odeyinka |
author_sort | Nathaniel Ayinde Olatunde |
collection | DOAJ |
description | Purpose – The purpose of the study is to examine the stakeholder identification (SI) methods used in building projects procured by private corporate organisations in Southwestern Nigeria to draw a correlation between methods used for SI and project performance in the study area, thereby enhancing project performance. Design/methodology/approach – The study used a census survey to purposively select 30 projects managers (who indicated from a first-stage questionnaire) that they have participated in structured stakeholder management (SM) from a list of 106 project managers and client representatives who have been involved in SM of building projects procured by private corporate organisations between 2008 and 2017 in the study area. A second-stage questionnaire was designed to elicit information from the respondents. The quantitative data that were collected were analysed using mean score (MS) analysis and Analysis of variance (ANOVA). Findings – The study found that brainstorming in group meetings (MS = 4.33), interviews with the expert (MS = 3.20) and identification by other stakeholders (MS = 3.00) are the most frequently used SI methods in the study area. It was also found that the use of a questionnaire (MS = 0.87), Delphi method (MS = 0.80) and public hearing (MS = 0.57) was rare for SI in the study area. A further result showed that there was no significant difference in the opinion of project managers on 85% of methods used for SI in the study area irrespective of the procurement method employed. Practical implications – The study examined the methods project managers used for SI on building projects procured by private corporate organisations to advocate for more robust and all-inclusive SI methods. Originality/value – The study empirically examined methods used for SI and correlated them to project performance. |
first_indexed | 2024-03-13T01:05:03Z |
format | Article |
id | doaj.art-95d1352a0d854a47afb5c9570b307372 |
institution | Directory Open Access Journal |
issn | 2634-2499 2634-2502 |
language | English |
last_indexed | 2024-03-13T01:05:03Z |
publishDate | 2021-12-01 |
publisher | Emerald Publishing |
record_format | Article |
series | Frontiers in Engineering and Built Environment |
spelling | doaj.art-95d1352a0d854a47afb5c9570b3073722023-07-06T07:24:59ZengEmerald PublishingFrontiers in Engineering and Built Environment2634-24992634-25022021-12-011221722910.1108/FEBE-05-2021-0023Stakeholder identification methods used in private organisations’ projects in NigeriaNathaniel Ayinde Olatunde0Imoleayo Abraham Awodele1Henry Agboola Odeyinka2Quantity Surveying Department, Federal University Oye-Ekiti, Oye, NigeriaQuantity Surveying Department, Durban University of Technology, Durban, South AfricaQuantity Surveying, Obafemi Awolowo University, Ile-Ife, NigeriaPurpose – The purpose of the study is to examine the stakeholder identification (SI) methods used in building projects procured by private corporate organisations in Southwestern Nigeria to draw a correlation between methods used for SI and project performance in the study area, thereby enhancing project performance. Design/methodology/approach – The study used a census survey to purposively select 30 projects managers (who indicated from a first-stage questionnaire) that they have participated in structured stakeholder management (SM) from a list of 106 project managers and client representatives who have been involved in SM of building projects procured by private corporate organisations between 2008 and 2017 in the study area. A second-stage questionnaire was designed to elicit information from the respondents. The quantitative data that were collected were analysed using mean score (MS) analysis and Analysis of variance (ANOVA). Findings – The study found that brainstorming in group meetings (MS = 4.33), interviews with the expert (MS = 3.20) and identification by other stakeholders (MS = 3.00) are the most frequently used SI methods in the study area. It was also found that the use of a questionnaire (MS = 0.87), Delphi method (MS = 0.80) and public hearing (MS = 0.57) was rare for SI in the study area. A further result showed that there was no significant difference in the opinion of project managers on 85% of methods used for SI in the study area irrespective of the procurement method employed. Practical implications – The study examined the methods project managers used for SI on building projects procured by private corporate organisations to advocate for more robust and all-inclusive SI methods. Originality/value – The study empirically examined methods used for SI and correlated them to project performance.https://www.emerald.com/insight/content/doi/10.1108/FEBE-05-2021-0023/full/pdfBuilding projectsPrivateCorporate organisations and stakeholder identification |
spellingShingle | Nathaniel Ayinde Olatunde Imoleayo Abraham Awodele Henry Agboola Odeyinka Stakeholder identification methods used in private organisations’ projects in Nigeria Frontiers in Engineering and Built Environment Building projects Private Corporate organisations and stakeholder identification |
title | Stakeholder identification methods used in private organisations’ projects in Nigeria |
title_full | Stakeholder identification methods used in private organisations’ projects in Nigeria |
title_fullStr | Stakeholder identification methods used in private organisations’ projects in Nigeria |
title_full_unstemmed | Stakeholder identification methods used in private organisations’ projects in Nigeria |
title_short | Stakeholder identification methods used in private organisations’ projects in Nigeria |
title_sort | stakeholder identification methods used in private organisations projects in nigeria |
topic | Building projects Private Corporate organisations and stakeholder identification |
url | https://www.emerald.com/insight/content/doi/10.1108/FEBE-05-2021-0023/full/pdf |
work_keys_str_mv | AT nathanielayindeolatunde stakeholderidentificationmethodsusedinprivateorganisationsprojectsinnigeria AT imoleayoabrahamawodele stakeholderidentificationmethodsusedinprivateorganisationsprojectsinnigeria AT henryagboolaodeyinka stakeholderidentificationmethodsusedinprivateorganisationsprojectsinnigeria |