An Integrated ANP and MARCOS for Green Supplier Selection: A Case Study on Construction Industry

Raw material suppliers are important in production, especially in the construction industry. It is because suppliers determine the availability of raw materials in a project. The research aims to propose a new integrated procedure for Green Supplier Selection in the Construction Industry. The propos...

Full description

Bibliographic Details
Main Authors: Shanty Kusuma Dewi, Zara Safira Ramadhani
Format: Article
Language:English
Published: Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang 2022-08-01
Series:Jurnal Teknik Industri
Subjects:
Online Access:https://ejournal.umm.ac.id/index.php/industri/article/view/25668
_version_ 1797277299056312320
author Shanty Kusuma Dewi
Zara Safira Ramadhani
author_facet Shanty Kusuma Dewi
Zara Safira Ramadhani
author_sort Shanty Kusuma Dewi
collection DOAJ
description Raw material suppliers are important in production, especially in the construction industry. It is because suppliers determine the availability of raw materials in a project. The research aims to propose a new integrated procedure for Green Supplier Selection in the Construction Industry. The proposed integration method is Analytical Network Process (ANP) and Measurement Alternatives and Ranking according to Compromise Solution (MARCOS) method. Both methods are Multi-Criteria Decision Making (MCDM) procedures. The ANP method is used to determine the weight of each criterion, and the MARCOS method is used to determine the weight of the best supplier. Seventeen criteria are used in supplier selection involving economic and environmental dimensions. The results showed that based on the ANP method, the most important criterion was the consistent quality of goods. Meanwhile, three suppliers were analyzed for selection based on the MARCOS procedure. The results show that the best supplier is supplier X with a utility function value of 0.749. These results show that the proposed procedure (integration of ANP and MARCOS) effectively solves Green Supplier Selection.
first_indexed 2024-03-07T15:45:42Z
format Article
id doaj.art-9684de38f79f4e3f9a0e91e1578babdd
institution Directory Open Access Journal
issn 1978-1431
2527-4112
language English
last_indexed 2024-03-07T15:45:42Z
publishDate 2022-08-01
publisher Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang
record_format Article
series Jurnal Teknik Industri
spelling doaj.art-9684de38f79f4e3f9a0e91e1578babdd2024-03-05T04:34:33ZengJurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah MalangJurnal Teknik Industri1978-14312527-41122022-08-0123213314810.22219/JTIUMM.Vol23.No2.133-14823477An Integrated ANP and MARCOS for Green Supplier Selection: A Case Study on Construction IndustryShanty Kusuma Dewi0Zara Safira Ramadhani1Departement of Industrial Engineering University Of Muhammadiyah Malang (UMM), Indonesia. Address: Jl. Tlogomas No 246 Malang, Jawa Timur, Indonesia. Email: shanty.kusumadewi@gmail.com, Indonesia, IndonesiaDepartment of Industrial Engineering, Universitas Muhammadiyah Malang, Malang, IndonesiaRaw material suppliers are important in production, especially in the construction industry. It is because suppliers determine the availability of raw materials in a project. The research aims to propose a new integrated procedure for Green Supplier Selection in the Construction Industry. The proposed integration method is Analytical Network Process (ANP) and Measurement Alternatives and Ranking according to Compromise Solution (MARCOS) method. Both methods are Multi-Criteria Decision Making (MCDM) procedures. The ANP method is used to determine the weight of each criterion, and the MARCOS method is used to determine the weight of the best supplier. Seventeen criteria are used in supplier selection involving economic and environmental dimensions. The results showed that based on the ANP method, the most important criterion was the consistent quality of goods. Meanwhile, three suppliers were analyzed for selection based on the MARCOS procedure. The results show that the best supplier is supplier X with a utility function value of 0.749. These results show that the proposed procedure (integration of ANP and MARCOS) effectively solves Green Supplier Selection.https://ejournal.umm.ac.id/index.php/industri/article/view/25668greensupplier selectionanalytic network processmarcosmulti criteria decision making
spellingShingle Shanty Kusuma Dewi
Zara Safira Ramadhani
An Integrated ANP and MARCOS for Green Supplier Selection: A Case Study on Construction Industry
Jurnal Teknik Industri
green
supplier selection
analytic network process
marcos
multi criteria decision making
title An Integrated ANP and MARCOS for Green Supplier Selection: A Case Study on Construction Industry
title_full An Integrated ANP and MARCOS for Green Supplier Selection: A Case Study on Construction Industry
title_fullStr An Integrated ANP and MARCOS for Green Supplier Selection: A Case Study on Construction Industry
title_full_unstemmed An Integrated ANP and MARCOS for Green Supplier Selection: A Case Study on Construction Industry
title_short An Integrated ANP and MARCOS for Green Supplier Selection: A Case Study on Construction Industry
title_sort integrated anp and marcos for green supplier selection a case study on construction industry
topic green
supplier selection
analytic network process
marcos
multi criteria decision making
url https://ejournal.umm.ac.id/index.php/industri/article/view/25668
work_keys_str_mv AT shantykusumadewi anintegratedanpandmarcosforgreensupplierselectionacasestudyonconstructionindustry
AT zarasafiraramadhani anintegratedanpandmarcosforgreensupplierselectionacasestudyonconstructionindustry
AT shantykusumadewi integratedanpandmarcosforgreensupplierselectionacasestudyonconstructionindustry
AT zarasafiraramadhani integratedanpandmarcosforgreensupplierselectionacasestudyonconstructionindustry