Environmental safety assessment in the influence zone of the existing Zelenchukskaya HPP-PSHS and Krasnogorsk HPP-1, HPP-2 under construction in the area of Ust-Dzhegutinsky reservoir location
«Environmental safety “in the considered spatial limits of the Upper Kuban basin geosystem (F w=11,0*103 km3, W l=3,3*103 km3, Watm=110*103 Wb.g.U.K..=124,3*103 km3) makes up about 21.4% of the spatial limits of the Kuban River, where water resources are formed according to the average long-term dat...
Main Authors: | Bondarenko Vladimir, Ylyasov Alla-Brerdi, Mirzoev M., Shtavdaker Maria |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/57/e3sconf_catpid2021_09005.pdf |
Similar Items
-
Assessment of environmental safety in the influence zone of the current Zelenchukskaya HPP-PSPP and Krasnogorsky HPP-1, HPP-2 under construction in the area of Ust-Dzhegutinsky reservoir location
by: Bondarenko Vladimir, et al.
Published: (2021-01-01) -
HPP architects approaches /
by: Heupel, Sandra
Published: (2009) -
Selection of technical components of Micro HPP
by: Salomov Uktam, et al.
Published: (2024-01-01) -
Capacity of second spillway of Boguchanskaya HPP
by: Gouriev A. P., et al.
Published: (2023-01-01) -
Excitation system testing in HPP 'Uvac'
by: Milojčić Nemanja, et al.
Published: (2011-01-01)