Aplikasi Response Surface Methodology pada Optimasi Penambahan Blast Furnace Slag Terhadap Waktu Pengikatan dan Kuat Tekan Semen
The production of clinker consumes high energy and causes high production cost of cement industry. It can be reduced by adding blast furnace slag as a mixture in cement production. The blast furnace slag - clinker mixture can produce cement with setting time and compressive strength according to SNI...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Politeknik Negeri Malang
2020-04-01
|
Series: | Jurnal Teknik Kimia dan Lingkungan |
Subjects: | |
Online Access: | http://jurnal.polinema.ac.id/index.php/jtkl/article/view/1614 |
_version_ | 1797831069355999232 |
---|---|
author | Hardjono Hardjono Cucuk Evi Lusiani Agung Ari Wibowo Mochammad Agung Indra Iswara |
author_facet | Hardjono Hardjono Cucuk Evi Lusiani Agung Ari Wibowo Mochammad Agung Indra Iswara |
author_sort | Hardjono Hardjono |
collection | DOAJ |
description | The production of clinker consumes high energy and causes high production cost of cement industry. It can be reduced by adding blast furnace slag as a mixture in cement production. The blast furnace slag - clinker mixture can produce cement with setting time and compressive strength according to SNI. The effect of the addition of blast furnace slag as a clinker mixture to the setting time and compressive strength of cement can be optimized by response surface methodology (RSM) using Central Composite Design (CCD). Optimization by using RSM aims to determine the optimum condition of the blast furnace slag – clinker mixture to the initial setting time, final setting time, and compressive strength. ANOVA test results and response surface analysis show that the addition of blast furnace slag into the cement mixture has a significant influence on the initial setting time, final setting time, and compressive strength. The addition of 5% blast furnace slag with 92.5% clinker in the mixture of clinker and gypsum is the optimum condition which gives a significant effect on the response variable. |
first_indexed | 2024-04-09T13:47:13Z |
format | Article |
id | doaj.art-96ef89baf9cf4ae1a643c14b3f4bf8fb |
institution | Directory Open Access Journal |
issn | 2579-8537 2579-9746 |
language | English |
last_indexed | 2024-04-09T13:47:13Z |
publishDate | 2020-04-01 |
publisher | Politeknik Negeri Malang |
record_format | Article |
series | Jurnal Teknik Kimia dan Lingkungan |
spelling | doaj.art-96ef89baf9cf4ae1a643c14b3f4bf8fb2023-05-09T03:21:55ZengPoliteknik Negeri MalangJurnal Teknik Kimia dan Lingkungan2579-85372579-97462020-04-0141616710.33795/jtkl.v4i1.1501614Aplikasi Response Surface Methodology pada Optimasi Penambahan Blast Furnace Slag Terhadap Waktu Pengikatan dan Kuat Tekan SemenHardjono Hardjono0Cucuk Evi Lusiani1Agung Ari Wibowo2Mochammad Agung Indra Iswara3Jurusan Teknik Kimia, Politeknik Negeri Malang, Jl. Soekarno Hatta No. 9, Malang 65141, IndonesiaJurusan Teknik Kimia, Politeknik Negeri Malang, Jl. Soekarno Hatta No. 9, Malang 65141, IndonesiaJurusan Teknik Kimia, Politeknik Negeri Malang, Jl. Soekarno Hatta No. 9, Malang 65141, IndonesiaJurusan Teknik Kimia, Politeknik Negeri Malang, Jl. Soekarno Hatta No. 9, Malang 65141, IndonesiaThe production of clinker consumes high energy and causes high production cost of cement industry. It can be reduced by adding blast furnace slag as a mixture in cement production. The blast furnace slag - clinker mixture can produce cement with setting time and compressive strength according to SNI. The effect of the addition of blast furnace slag as a clinker mixture to the setting time and compressive strength of cement can be optimized by response surface methodology (RSM) using Central Composite Design (CCD). Optimization by using RSM aims to determine the optimum condition of the blast furnace slag – clinker mixture to the initial setting time, final setting time, and compressive strength. ANOVA test results and response surface analysis show that the addition of blast furnace slag into the cement mixture has a significant influence on the initial setting time, final setting time, and compressive strength. The addition of 5% blast furnace slag with 92.5% clinker in the mixture of clinker and gypsum is the optimum condition which gives a significant effect on the response variable.http://jurnal.polinema.ac.id/index.php/jtkl/article/view/1614blast furnace slagclinkerresponse surface methodology. |
spellingShingle | Hardjono Hardjono Cucuk Evi Lusiani Agung Ari Wibowo Mochammad Agung Indra Iswara Aplikasi Response Surface Methodology pada Optimasi Penambahan Blast Furnace Slag Terhadap Waktu Pengikatan dan Kuat Tekan Semen Jurnal Teknik Kimia dan Lingkungan blast furnace slag clinker response surface methodology. |
title | Aplikasi Response Surface Methodology pada Optimasi Penambahan Blast Furnace Slag Terhadap Waktu Pengikatan dan Kuat Tekan Semen |
title_full | Aplikasi Response Surface Methodology pada Optimasi Penambahan Blast Furnace Slag Terhadap Waktu Pengikatan dan Kuat Tekan Semen |
title_fullStr | Aplikasi Response Surface Methodology pada Optimasi Penambahan Blast Furnace Slag Terhadap Waktu Pengikatan dan Kuat Tekan Semen |
title_full_unstemmed | Aplikasi Response Surface Methodology pada Optimasi Penambahan Blast Furnace Slag Terhadap Waktu Pengikatan dan Kuat Tekan Semen |
title_short | Aplikasi Response Surface Methodology pada Optimasi Penambahan Blast Furnace Slag Terhadap Waktu Pengikatan dan Kuat Tekan Semen |
title_sort | aplikasi response surface methodology pada optimasi penambahan blast furnace slag terhadap waktu pengikatan dan kuat tekan semen |
topic | blast furnace slag clinker response surface methodology. |
url | http://jurnal.polinema.ac.id/index.php/jtkl/article/view/1614 |
work_keys_str_mv | AT hardjonohardjono aplikasiresponsesurfacemethodologypadaoptimasipenambahanblastfurnaceslagterhadapwaktupengikatandankuattekansemen AT cucukevilusiani aplikasiresponsesurfacemethodologypadaoptimasipenambahanblastfurnaceslagterhadapwaktupengikatandankuattekansemen AT agungariwibowo aplikasiresponsesurfacemethodologypadaoptimasipenambahanblastfurnaceslagterhadapwaktupengikatandankuattekansemen AT mochammadagungindraiswara aplikasiresponsesurfacemethodologypadaoptimasipenambahanblastfurnaceslagterhadapwaktupengikatandankuattekansemen |