Economic Analysis of Hybrid Power Plant (Solar-Diesel) on Kawaluso Island, North Sulawesi
Kawaluso Island is one of the outermost islands in Indonesia with a distance of 68 KM from the city of Tahuna or 5-10 hours by boat from the capital of the Sangihe Islands Regency, Tahuna. Currently, electricity on Kawaluso Island is supplied by a diesel power plant (PLTD) with a capacity of 200 kW....
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Departement of Electrical Engineering, Faculty of Engineering, Universitas Brawijaya
2023-04-01
|
Series: | Jurnal EECCIS (Electrics, Electronics, Communications, Controls, Informatics, Systems) |
Subjects: | |
Online Access: | https://jurnaleeccis.ub.ac.id/index.php/eeccis/article/view/1633 |
_version_ | 1797640079070461952 |
---|---|
author | Muhammad Ilham Amba Rinaldy Dalimi |
author_facet | Muhammad Ilham Amba Rinaldy Dalimi |
author_sort | Muhammad Ilham Amba |
collection | DOAJ |
description | Kawaluso Island is one of the outermost islands in Indonesia with a distance of 68 KM from the city of Tahuna or 5-10 hours by boat from the capital of the Sangihe Islands Regency, Tahuna. Currently, electricity on Kawaluso Island is supplied by a diesel power plant (PLTD) with a capacity of 200 kW. This condition causes Kawaluso Island to be electrified 12 hours per day. So that additional sources of power plant are needed so that the electricity on Kawaluso Island is on 24 hours a day. Therefore, a solar power plant (PLTS) is one of alternative as additional power for Kawaluso Island and reduces the cost of production. A diesel power plant where the price of industrial fuel reaches up to Rp. 24.500 and it make Cost of Energy Rp. 10.360/kWh. The method used in this study uses the Levelized Cost of Energy (LcoE) method. The results of the analysis show that the hybrid between diesel power plant and solar power plant 64 kWp and 72 kWp has a Life Cycle Cost (LCC) value of Rp24.389.601.114,40 and Rp. 20.589.498.278,40 With a Cost of Energy (COE) of Rp. 7.432 and Rp. 5.601/kWh. Net Present Value (NPV) obtained is positive. And the payback period is 3 and 9 years of investment and is categorized as feasible to continue. |
first_indexed | 2024-03-11T13:26:39Z |
format | Article |
id | doaj.art-974b00422d87448f96d1a3d83cee28a9 |
institution | Directory Open Access Journal |
issn | 2460-8122 |
language | English |
last_indexed | 2024-03-11T13:26:39Z |
publishDate | 2023-04-01 |
publisher | Departement of Electrical Engineering, Faculty of Engineering, Universitas Brawijaya |
record_format | Article |
series | Jurnal EECCIS (Electrics, Electronics, Communications, Controls, Informatics, Systems) |
spelling | doaj.art-974b00422d87448f96d1a3d83cee28a92023-11-03T07:20:27ZengDepartement of Electrical Engineering, Faculty of Engineering, Universitas BrawijayaJurnal EECCIS (Electrics, Electronics, Communications, Controls, Informatics, Systems)2460-81222023-04-01171132110.21776/jeeccis.v17i1.16332065Economic Analysis of Hybrid Power Plant (Solar-Diesel) on Kawaluso Island, North SulawesiMuhammad Ilham Amba0Rinaldy Dalimi1Universitas IndonesiaUniversitas IndonesiaKawaluso Island is one of the outermost islands in Indonesia with a distance of 68 KM from the city of Tahuna or 5-10 hours by boat from the capital of the Sangihe Islands Regency, Tahuna. Currently, electricity on Kawaluso Island is supplied by a diesel power plant (PLTD) with a capacity of 200 kW. This condition causes Kawaluso Island to be electrified 12 hours per day. So that additional sources of power plant are needed so that the electricity on Kawaluso Island is on 24 hours a day. Therefore, a solar power plant (PLTS) is one of alternative as additional power for Kawaluso Island and reduces the cost of production. A diesel power plant where the price of industrial fuel reaches up to Rp. 24.500 and it make Cost of Energy Rp. 10.360/kWh. The method used in this study uses the Levelized Cost of Energy (LcoE) method. The results of the analysis show that the hybrid between diesel power plant and solar power plant 64 kWp and 72 kWp has a Life Cycle Cost (LCC) value of Rp24.389.601.114,40 and Rp. 20.589.498.278,40 With a Cost of Energy (COE) of Rp. 7.432 and Rp. 5.601/kWh. Net Present Value (NPV) obtained is positive. And the payback period is 3 and 9 years of investment and is categorized as feasible to continue.https://jurnaleeccis.ub.ac.id/index.php/eeccis/article/view/1633cost of energyhybrid power plantkawaluso islandlife cycle costsolar energy |
spellingShingle | Muhammad Ilham Amba Rinaldy Dalimi Economic Analysis of Hybrid Power Plant (Solar-Diesel) on Kawaluso Island, North Sulawesi Jurnal EECCIS (Electrics, Electronics, Communications, Controls, Informatics, Systems) cost of energy hybrid power plant kawaluso island life cycle cost solar energy |
title | Economic Analysis of Hybrid Power Plant (Solar-Diesel) on Kawaluso Island, North Sulawesi |
title_full | Economic Analysis of Hybrid Power Plant (Solar-Diesel) on Kawaluso Island, North Sulawesi |
title_fullStr | Economic Analysis of Hybrid Power Plant (Solar-Diesel) on Kawaluso Island, North Sulawesi |
title_full_unstemmed | Economic Analysis of Hybrid Power Plant (Solar-Diesel) on Kawaluso Island, North Sulawesi |
title_short | Economic Analysis of Hybrid Power Plant (Solar-Diesel) on Kawaluso Island, North Sulawesi |
title_sort | economic analysis of hybrid power plant solar diesel on kawaluso island north sulawesi |
topic | cost of energy hybrid power plant kawaluso island life cycle cost solar energy |
url | https://jurnaleeccis.ub.ac.id/index.php/eeccis/article/view/1633 |
work_keys_str_mv | AT muhammadilhamamba economicanalysisofhybridpowerplantsolardieselonkawalusoislandnorthsulawesi AT rinaldydalimi economicanalysisofhybridpowerplantsolardieselonkawalusoislandnorthsulawesi |