THE MEASUREMENT OF HIGH-SPEED RAILWAY (HSR)-PRECISION ENGINEERING

The paperproposed theoptimization ofthe network construction timing of the control network according to the specific conditions of the survey route. Moreover,presented here are the adjustments according tothe layout requirements of the control network layout process, str...

Full description

Bibliographic Details
Main Authors: Qiyuan Peng, Malik Muneeb Abid
Format: Article
Language:English
Published: Czech Technical University, Prague 2019-12-01
Series:Civil Engineering Journal
Subjects:
Online Access:http://civilengineeringjournal.cz/archive/issues/2019/2019_4/4-2019-0042-(517-522).pdf
_version_ 1827886470189285376
author Qiyuan Peng
Malik Muneeb Abid
author_facet Qiyuan Peng
Malik Muneeb Abid
author_sort Qiyuan Peng
collection DOAJ
description The paperproposed theoptimization ofthe network construction timing of the control network according to the specific conditions of the survey route. Moreover,presented here are the adjustments according tothe layout requirements of the control network layout process, strengtheningthe control of the line level base point during the construction process. Several optimization solutions are discussed for the special design of the level control before the construction of the long tunnel. It has been explainedthe methodology tointroduce new Continuously Operating Reference Station (CORS)technology in railway survey and design withappropriately adjustment ofthe position requirements of the control network according to the specification. In order to carry out the special design of the levelling route with precision, it is advisable to set a certain stable reference point in the level control of the long line. The proposed methodologycan effectively solve some problems existing in the current high-speed railway construction process, and make the precision measurement control network better for survey, design, construction, supervision and operation
first_indexed 2024-03-12T20:02:58Z
format Article
id doaj.art-979ca41bf7d749198f3d3e7ed500060b
institution Directory Open Access Journal
issn 1805-2576
language English
last_indexed 2024-03-12T20:02:58Z
publishDate 2019-12-01
publisher Czech Technical University, Prague
record_format Article
series Civil Engineering Journal
spelling doaj.art-979ca41bf7d749198f3d3e7ed500060b2023-08-02T02:16:50ZengCzech Technical University, PragueCivil Engineering Journal1805-25762019-12-012019451752210.14311/CEJ.2019.04.0042THE MEASUREMENT OF HIGH-SPEED RAILWAY (HSR)-PRECISION ENGINEERINGQiyuan Peng0Malik Muneeb Abid1School of Transportation and Logistics, Southwest Jiaotong University, Chengdu 610031, ChinaDepartment of Civil Engineering, Collegeof Engineering and Technology,Universityof Sargodha, PakistanThe paperproposed theoptimization ofthe network construction timing of the control network according to the specific conditions of the survey route. Moreover,presented here are the adjustments according tothe layout requirements of the control network layout process, strengtheningthe control of the line level base point during the construction process. Several optimization solutions are discussed for the special design of the level control before the construction of the long tunnel. It has been explainedthe methodology tointroduce new Continuously Operating Reference Station (CORS)technology in railway survey and design withappropriately adjustment ofthe position requirements of the control network according to the specification. In order to carry out the special design of the levelling route with precision, it is advisable to set a certain stable reference point in the level control of the long line. The proposed methodologycan effectively solve some problems existing in the current high-speed railway construction process, and make the precision measurement control network better for survey, design, construction, supervision and operationhttp://civilengineeringjournal.cz/archive/issues/2019/2019_4/4-2019-0042-(517-522).pdfhigh-speed railwayprecision engineering surveynetwork construction timinglevelling network
spellingShingle Qiyuan Peng
Malik Muneeb Abid
THE MEASUREMENT OF HIGH-SPEED RAILWAY (HSR)-PRECISION ENGINEERING
Civil Engineering Journal
high-speed railway
precision engineering survey
network construction timing
levelling network
title THE MEASUREMENT OF HIGH-SPEED RAILWAY (HSR)-PRECISION ENGINEERING
title_full THE MEASUREMENT OF HIGH-SPEED RAILWAY (HSR)-PRECISION ENGINEERING
title_fullStr THE MEASUREMENT OF HIGH-SPEED RAILWAY (HSR)-PRECISION ENGINEERING
title_full_unstemmed THE MEASUREMENT OF HIGH-SPEED RAILWAY (HSR)-PRECISION ENGINEERING
title_short THE MEASUREMENT OF HIGH-SPEED RAILWAY (HSR)-PRECISION ENGINEERING
title_sort measurement of high speed railway hsr precision engineering
topic high-speed railway
precision engineering survey
network construction timing
levelling network
url http://civilengineeringjournal.cz/archive/issues/2019/2019_4/4-2019-0042-(517-522).pdf
work_keys_str_mv AT qiyuanpeng themeasurementofhighspeedrailwayhsrprecisionengineering
AT malikmuneebabid themeasurementofhighspeedrailwayhsrprecisionengineering
AT qiyuanpeng measurementofhighspeedrailwayhsrprecisionengineering
AT malikmuneebabid measurementofhighspeedrailwayhsrprecisionengineering