Lower drive of continuous action unit to form underlying layer of road

Introduction. A continuous action unit for the formation of an underlying layer is designed to increase productivity in the construction of roads and other facilities, for which it is necessary to remove the top layer of soil. In the bucket of the continuous action unit to form an underlying layer o...

Full description

Bibliographic Details
Main Author: V. A. Nikolaiev
Format: Article
Language:Russian
Published: Siberian State Automobile and Highway University 2021-03-01
Series:Вестник СибАДИ
Subjects:
Online Access:https://vestnik.sibadi.org/jour/article/view/1222
_version_ 1797873454570012672
author V. A. Nikolaiev
author_facet V. A. Nikolaiev
author_sort V. A. Nikolaiev
collection DOAJ
description Introduction. A continuous action unit for the formation of an underlying layer is designed to increase productivity in the construction of roads and other facilities, for which it is necessary to remove the top layer of soil. In the bucket of the continuous action unit to form an underlying layer of roads provides the use of working bodies, cutting the ground with blades of knives. The cut-off soil enters the buckets. The forces attached to the bucket are considered. Theoretically reasonable total energy costs for ground cutting of one cubic meter by buckets of continuous action unit to form an underlying layer of roads requires 109 kilojoules. Based on the calculations carried out, it is possible to determine the torque, the power required for the lower drive, the transmission ratio from the hydraulic motor to the stars, to develop the design of many elements of the continuous action unit to form the underlying layer of the road.The method of research. To determine the torque, the power required for the lower drive, the transmission ratio from the hydraulic motor to the asterisks, to the projection of the bucket on the horizontal plane attached all forces are applied directed along the bucket. As a result of their addition, the total maximum traction force of moving all the boilers during their filling with soil was revealed. On the basis of this, the method of calculating the parameters of the required is given. There is a danger of the ground being poured out of the bucket when it is rotated on the leading stars of the lower drive. To check the parameters received, the bucket is rotated by 90 degrees on the leading stars of the lower drive. The forces acting on the ground, located in the bucket, at the moment of the beginning of the turn of the bucket were revealed. A system of equations has been created, on the basis of which the condition of inadmissibility of the dumping of soil from the bucket at its turn on the leading stars has been established.Results. As a result of the addition of forces directed in the course of the bucket, the total maximum traction force of moving all the boilers during their filling with the ground, traction force on the right chain and left chain is defined. Traction chains are chosen by destructive load. The torque of the lower drive, the angular speed of the drive stars, the power required for the lower drive, the transmission ratio from the hydraulic motor to the asterisk are calculated. Based on the transferable power, a gerotor motor is chosen for the lower drive of the unit. On the basis of the calculations the design of chains, support rink, chain suspension have been developed.Conclusion. Based on the calculations made, the maximum traction force of all the buckets during the period when they are filled with soil is 11,870 newtons, the torque of the lower drive is 2,362 newtonometers, the speed of the chains is 1,686 meters per second, the angular velocity of the drive stars is 8,47 radians per second, power required for lower drive is 20 kilowatts. Based on the transferable power, it is advisable to use MT-160 gerotor motor and a single-stage planetary gearbox with a transmission ratio from the hydraulic motor to the stars 7,674. The calculations made it possible to develop the design of many elements of the continuous action unit to form an underlying layer of roads.
first_indexed 2024-04-10T01:15:29Z
format Article
id doaj.art-984d3570837c44ce9e4b4132cc773d63
institution Directory Open Access Journal
issn 2071-7296
2658-5626
language Russian
last_indexed 2024-04-10T01:15:29Z
publishDate 2021-03-01
publisher Siberian State Automobile and Highway University
record_format Article
series Вестник СибАДИ
spelling doaj.art-984d3570837c44ce9e4b4132cc773d632023-03-13T09:52:50ZrusSiberian State Automobile and Highway UniversityВестник СибАДИ2071-72962658-56262021-03-01181304110.26518/2071-7296-2021-18-1-30-41662Lower drive of continuous action unit to form underlying layer of roadV. A. Nikolaiev0ФГБОУ ВО ЯГТУIntroduction. A continuous action unit for the formation of an underlying layer is designed to increase productivity in the construction of roads and other facilities, for which it is necessary to remove the top layer of soil. In the bucket of the continuous action unit to form an underlying layer of roads provides the use of working bodies, cutting the ground with blades of knives. The cut-off soil enters the buckets. The forces attached to the bucket are considered. Theoretically reasonable total energy costs for ground cutting of one cubic meter by buckets of continuous action unit to form an underlying layer of roads requires 109 kilojoules. Based on the calculations carried out, it is possible to determine the torque, the power required for the lower drive, the transmission ratio from the hydraulic motor to the stars, to develop the design of many elements of the continuous action unit to form the underlying layer of the road.The method of research. To determine the torque, the power required for the lower drive, the transmission ratio from the hydraulic motor to the asterisks, to the projection of the bucket on the horizontal plane attached all forces are applied directed along the bucket. As a result of their addition, the total maximum traction force of moving all the boilers during their filling with soil was revealed. On the basis of this, the method of calculating the parameters of the required is given. There is a danger of the ground being poured out of the bucket when it is rotated on the leading stars of the lower drive. To check the parameters received, the bucket is rotated by 90 degrees on the leading stars of the lower drive. The forces acting on the ground, located in the bucket, at the moment of the beginning of the turn of the bucket were revealed. A system of equations has been created, on the basis of which the condition of inadmissibility of the dumping of soil from the bucket at its turn on the leading stars has been established.Results. As a result of the addition of forces directed in the course of the bucket, the total maximum traction force of moving all the boilers during their filling with the ground, traction force on the right chain and left chain is defined. Traction chains are chosen by destructive load. The torque of the lower drive, the angular speed of the drive stars, the power required for the lower drive, the transmission ratio from the hydraulic motor to the asterisk are calculated. Based on the transferable power, a gerotor motor is chosen for the lower drive of the unit. On the basis of the calculations the design of chains, support rink, chain suspension have been developed.Conclusion. Based on the calculations made, the maximum traction force of all the buckets during the period when they are filled with soil is 11,870 newtons, the torque of the lower drive is 2,362 newtonometers, the speed of the chains is 1,686 meters per second, the angular velocity of the drive stars is 8,47 radians per second, power required for lower drive is 20 kilowatts. Based on the transferable power, it is advisable to use MT-160 gerotor motor and a single-stage planetary gearbox with a transmission ratio from the hydraulic motor to the stars 7,674. The calculations made it possible to develop the design of many elements of the continuous action unit to form an underlying layer of roads.https://vestnik.sibadi.org/jour/article/view/1222агрегат непрерывного действиягрунтпроекции сил в горизонтальной плоскоститяговое усилиетяговые цепивращающий моментнижний приводприводные звёздочки
spellingShingle V. A. Nikolaiev
Lower drive of continuous action unit to form underlying layer of road
Вестник СибАДИ
агрегат непрерывного действия
грунт
проекции сил в горизонтальной плоскости
тяговое усилие
тяговые цепи
вращающий момент
нижний привод
приводные звёздочки
title Lower drive of continuous action unit to form underlying layer of road
title_full Lower drive of continuous action unit to form underlying layer of road
title_fullStr Lower drive of continuous action unit to form underlying layer of road
title_full_unstemmed Lower drive of continuous action unit to form underlying layer of road
title_short Lower drive of continuous action unit to form underlying layer of road
title_sort lower drive of continuous action unit to form underlying layer of road
topic агрегат непрерывного действия
грунт
проекции сил в горизонтальной плоскости
тяговое усилие
тяговые цепи
вращающий момент
нижний привод
приводные звёздочки
url https://vestnik.sibadi.org/jour/article/view/1222
work_keys_str_mv AT vanikolaiev lowerdriveofcontinuousactionunittoformunderlyinglayerofroad