The Feasibility Study of Constructing Wind Power Plants in the North of Sistan and Baluchestan Province from a Climatological and Environmental Point of View

Iran is the most populated country in the Middle East. As a part of its development plans, it needs to increase its energy resources and  specifically invest in renewable energies. Wind, as one of the sources of renewable energy, has a special place in this regard. This is due to the geography and t...

Full description

Bibliographic Details
Main Authors: Azizoallah Goharnia, Mahmood khosravi, Mohsen Hamidianpour
Format: Article
Language:fas
Published: Yazd University 2019-01-01
Series:کاوش‌های جغرافیایی مناطق بیابانی
Subjects:
Online Access:http://grd.yazd.ac.ir/article_1471_5957ebf4d9e70afc4f4da8aeb80792bd.pdf
_version_ 1797823227233304576
author Azizoallah Goharnia
Mahmood khosravi
Mohsen Hamidianpour
author_facet Azizoallah Goharnia
Mahmood khosravi
Mohsen Hamidianpour
author_sort Azizoallah Goharnia
collection DOAJ
description Iran is the most populated country in the Middle East. As a part of its development plans, it needs to increase its energy resources and  specifically invest in renewable energies. Wind, as one of the sources of renewable energy, has a special place in this regard. This is due to the geography and topography of the country. In this study, the fuzzy system analysis process was used to weigh climatological and environmental variables on the purpose of determining suitable locations for building a wind power plant in the north of Sistan and Baluchestan province. The environmental variables were evaluated based on their influence and importance in the site selection process. The results showed that the north of the province can be categorized into four locations where wind farms can be established. They include locations with excellent (7142.45 Km²), good (1304.12 Km²), average (1635.65 Km²) and low potentials (6388.29 Km²). As the findings suggest, depending on the arrangement of 100 KW wind turbines, 307106 turbines can be installed in the region. The investment return period was calculated and found to be six years and seven months.
first_indexed 2024-03-13T10:20:55Z
format Article
id doaj.art-98962c5588c3434786e1bd963ab357f7
institution Directory Open Access Journal
issn 2345-332X
2588-7009
language fas
last_indexed 2024-03-13T10:20:55Z
publishDate 2019-01-01
publisher Yazd University
record_format Article
series کاوش‌های جغرافیایی مناطق بیابانی
spelling doaj.art-98962c5588c3434786e1bd963ab357f72023-05-20T13:04:20ZfasYazd Universityکاوش‌های جغرافیایی مناطق بیابانی2345-332X2588-70092019-01-016212010.29252/grd.2018.14711471The Feasibility Study of Constructing Wind Power Plants in the North of Sistan and Baluchestan Province from a Climatological and Environmental Point of ViewAzizoallah Goharnia0Mahmood khosravi1Mohsen Hamidianpour2MS in Climatology, Department of Climatology, University of Sistan and Baluchestan,Zahedan, IranProfessor in Climatology, Department of Climatology, University of Sistan and Baluchestan,Zahedan, IranAssistant professor in Climatology, Department of Climatology, University of Sistan and Baluchestan,Zahedan, IranIran is the most populated country in the Middle East. As a part of its development plans, it needs to increase its energy resources and  specifically invest in renewable energies. Wind, as one of the sources of renewable energy, has a special place in this regard. This is due to the geography and topography of the country. In this study, the fuzzy system analysis process was used to weigh climatological and environmental variables on the purpose of determining suitable locations for building a wind power plant in the north of Sistan and Baluchestan province. The environmental variables were evaluated based on their influence and importance in the site selection process. The results showed that the north of the province can be categorized into four locations where wind farms can be established. They include locations with excellent (7142.45 Km²), good (1304.12 Km²), average (1635.65 Km²) and low potentials (6388.29 Km²). As the findings suggest, depending on the arrangement of 100 KW wind turbines, 307106 turbines can be installed in the region. The investment return period was calculated and found to be six years and seven months.http://grd.yazd.ac.ir/article_1471_5957ebf4d9e70afc4f4da8aeb80792bd.pdfsite selectionwind farmwind energyfuzzy logicgiswind turbinerenewable energy
spellingShingle Azizoallah Goharnia
Mahmood khosravi
Mohsen Hamidianpour
The Feasibility Study of Constructing Wind Power Plants in the North of Sistan and Baluchestan Province from a Climatological and Environmental Point of View
کاوش‌های جغرافیایی مناطق بیابانی
site selection
wind farm
wind energy
fuzzy logic
gis
wind turbine
renewable energy
title The Feasibility Study of Constructing Wind Power Plants in the North of Sistan and Baluchestan Province from a Climatological and Environmental Point of View
title_full The Feasibility Study of Constructing Wind Power Plants in the North of Sistan and Baluchestan Province from a Climatological and Environmental Point of View
title_fullStr The Feasibility Study of Constructing Wind Power Plants in the North of Sistan and Baluchestan Province from a Climatological and Environmental Point of View
title_full_unstemmed The Feasibility Study of Constructing Wind Power Plants in the North of Sistan and Baluchestan Province from a Climatological and Environmental Point of View
title_short The Feasibility Study of Constructing Wind Power Plants in the North of Sistan and Baluchestan Province from a Climatological and Environmental Point of View
title_sort feasibility study of constructing wind power plants in the north of sistan and baluchestan province from a climatological and environmental point of view
topic site selection
wind farm
wind energy
fuzzy logic
gis
wind turbine
renewable energy
url http://grd.yazd.ac.ir/article_1471_5957ebf4d9e70afc4f4da8aeb80792bd.pdf
work_keys_str_mv AT azizoallahgoharnia thefeasibilitystudyofconstructingwindpowerplantsinthenorthofsistanandbaluchestanprovincefromaclimatologicalandenvironmentalpointofview
AT mahmoodkhosravi thefeasibilitystudyofconstructingwindpowerplantsinthenorthofsistanandbaluchestanprovincefromaclimatologicalandenvironmentalpointofview
AT mohsenhamidianpour thefeasibilitystudyofconstructingwindpowerplantsinthenorthofsistanandbaluchestanprovincefromaclimatologicalandenvironmentalpointofview
AT azizoallahgoharnia feasibilitystudyofconstructingwindpowerplantsinthenorthofsistanandbaluchestanprovincefromaclimatologicalandenvironmentalpointofview
AT mahmoodkhosravi feasibilitystudyofconstructingwindpowerplantsinthenorthofsistanandbaluchestanprovincefromaclimatologicalandenvironmentalpointofview
AT mohsenhamidianpour feasibilitystudyofconstructingwindpowerplantsinthenorthofsistanandbaluchestanprovincefromaclimatologicalandenvironmentalpointofview