Study on Crack Development of Concrete Lining with Insufficient Lining Thickness Based on CZM Method
The most common structural defect of a tunnel in the operation period is the cracking of concrete lining. The insufficient thickness of tunnel lining is one of the main reasons for its cracking. This study studied the cracking behavior of standard concrete specimens and the failure behavior of tunne...
Main Authors: | Jian Liu, Xuesen Zhang, Gaohang Lv, Kang Wang, Bo Han, Quanyi Xie |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-12-01
|
Series: | Materials |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1944/14/24/7862 |
Similar Items
-
Research on Shear Behavior and Crack Evolution of Symmetrical Discontinuous Rock Joints Based on FEM-CZM
by: Xianlong Wu, et al.
Published: (2020-08-01) -
Study of influence of various loading parameters on crack propagation by using Cohesive Zone Modeling (CZM) approach
by: Ahmed Riaz, et al.
Published: (2012-03-01) -
Simulation of crack propagation behavior of nuclear graphite by using XFEM, VCCT and CZM methods
by: Zihao Yu, et al.
Published: (2021-12-01) -
A mixed XFEM and CZM approach for predicting progressive failure in advanced SiC/SiC CMC component
by: Amit Patel, et al.
Published: (2022-10-01) -
Effect of defects and remediation measures on the internal forces caused by a local thickness reduction in the tunnel lining
by: Ping Lu, et al.
Published: (2022-02-01)