Study of power and voltage delivery after successfully black-start

Efforts to maintain the continuity of electricity distribution to customers and reduce the amount of Energy Not Distributed (END) are to speed up the recovery process due to disturbances in the electricity distribution system, especially blackouts. The strategy to speed up recovery in a total blacko...

Full description

Bibliographic Details
Main Authors: Andika Pradnya Satriawan, Saidah Saidah, Taufik Taufik
Format: Article
Language:English
Published: Universitas Mercu Buana 2022-10-01
Series:Jurnal Ilmiah SINERGI
Subjects:
Online Access:https://publikasi.mercubuana.ac.id/index.php/sinergi/article/view/14413
_version_ 1827833543986774016
author Andika Pradnya Satriawan
Saidah Saidah
Taufik Taufik
author_facet Andika Pradnya Satriawan
Saidah Saidah
Taufik Taufik
author_sort Andika Pradnya Satriawan
collection DOAJ
description Efforts to maintain the continuity of electricity distribution to customers and reduce the amount of Energy Not Distributed (END) are to speed up the recovery process due to disturbances in the electricity distribution system, especially blackouts. The strategy to speed up recovery in a total blackout is to do a black-start on a generator unit with a black-start facility and send voltage to a larger generator unit. At the Grati-Paiton Substation, the generator that has black-start facilities is the Grati Gas Steam Power Plant (GSPP). The delivery of power and voltage from the Grati-Paiton substation is required after the Grati GSPP successfully black-start. Study optimal power flow simulation in distributing power and voltage using DigSILENT software. Based on the simulation results, several schemes are used to distribute power and voltage from the Grati-Paiton substation within the generator’s Mvar. As a result, the voltage during the distribution process meets the criteria according to the Grid. The most optimal scheme is with the least number of stages, the production of Mvar, which is still safe for power generation, and the voltage at the end of the Paiton substation still meets the nominal voltage according to the Grid.
first_indexed 2024-03-12T05:32:40Z
format Article
id doaj.art-98baada9ab9e4622965f4c836db18194
institution Directory Open Access Journal
issn 1410-2331
2460-1217
language English
last_indexed 2024-03-12T05:32:40Z
publishDate 2022-10-01
publisher Universitas Mercu Buana
record_format Article
series Jurnal Ilmiah SINERGI
spelling doaj.art-98baada9ab9e4622965f4c836db181942023-09-03T06:44:31ZengUniversitas Mercu BuanaJurnal Ilmiah SINERGI1410-23312460-12172022-10-0126335537010.22441/sinergi.2022.3.0115488Study of power and voltage delivery after successfully black-startAndika Pradnya Satriawan0Saidah Saidah1Taufik Taufik2Department of Electrical Engineering, Faculty of Engineering, Universitas Bhayangkara SurabayaDepartment of Electrical Engineering, Faculty of Engineering, Universitas Bhayangkara SurabayaDepartment of Electrical Engineering, California Polytechnic State UniversityEfforts to maintain the continuity of electricity distribution to customers and reduce the amount of Energy Not Distributed (END) are to speed up the recovery process due to disturbances in the electricity distribution system, especially blackouts. The strategy to speed up recovery in a total blackout is to do a black-start on a generator unit with a black-start facility and send voltage to a larger generator unit. At the Grati-Paiton Substation, the generator that has black-start facilities is the Grati Gas Steam Power Plant (GSPP). The delivery of power and voltage from the Grati-Paiton substation is required after the Grati GSPP successfully black-start. Study optimal power flow simulation in distributing power and voltage using DigSILENT software. Based on the simulation results, several schemes are used to distribute power and voltage from the Grati-Paiton substation within the generator’s Mvar. As a result, the voltage during the distribution process meets the criteria according to the Grid. The most optimal scheme is with the least number of stages, the production of Mvar, which is still safe for power generation, and the voltage at the end of the Paiton substation still meets the nominal voltage according to the Grid.https://publikasi.mercubuana.ac.id/index.php/sinergi/article/view/14413black-startdigsilentgrati-paiton substation
spellingShingle Andika Pradnya Satriawan
Saidah Saidah
Taufik Taufik
Study of power and voltage delivery after successfully black-start
Jurnal Ilmiah SINERGI
black-start
digsilent
grati-paiton substation
title Study of power and voltage delivery after successfully black-start
title_full Study of power and voltage delivery after successfully black-start
title_fullStr Study of power and voltage delivery after successfully black-start
title_full_unstemmed Study of power and voltage delivery after successfully black-start
title_short Study of power and voltage delivery after successfully black-start
title_sort study of power and voltage delivery after successfully black start
topic black-start
digsilent
grati-paiton substation
url https://publikasi.mercubuana.ac.id/index.php/sinergi/article/view/14413
work_keys_str_mv AT andikapradnyasatriawan studyofpowerandvoltagedeliveryaftersuccessfullyblackstart
AT saidahsaidah studyofpowerandvoltagedeliveryaftersuccessfullyblackstart
AT taufiktaufik studyofpowerandvoltagedeliveryaftersuccessfullyblackstart