Study of power and voltage delivery after successfully black-start
Efforts to maintain the continuity of electricity distribution to customers and reduce the amount of Energy Not Distributed (END) are to speed up the recovery process due to disturbances in the electricity distribution system, especially blackouts. The strategy to speed up recovery in a total blacko...
Main Authors: | Andika Pradnya Satriawan, Saidah Saidah, Taufik Taufik |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Mercu Buana
2022-10-01
|
Series: | Jurnal Ilmiah SINERGI |
Subjects: | |
Online Access: | https://publikasi.mercubuana.ac.id/index.php/sinergi/article/view/14413 |
Similar Items
-
Dampak Penambahan Fly Ash Batu Bara Terhadap Kinerja Balok Beton Bertulang Tunggal
by: Yulinda Sukmawati, et al.
Published: (2024-07-01) -
Dampak Sekolah Gratis terhadap Kualitas Pendidikan di SMA Negeri 1 Pagar Alam
by: Latifah Kurnia Utami, et al.
Published: (2023-12-01) -
Optimization of Power System Black Start partition Target Network Taking into Account the Black Start Space-Time Support Capability of New Energy Station
by: Ruixin WANG, et al.
Published: (2024-10-01) -
Determination of conditions for the successful start-up of Combined Cycle Power Plant (CCPP) from Black Start Diesel Generators (BSDG)
by: V. V. Zhukov, et al.
Published: (2018-02-01) -
A Black Start Scheme Based on Modular Multilevel Control-High Voltage Direct Current
by: Zecheng Li, et al.
Published: (2018-07-01)