Research on the scheduling method of ground resource under uncertain arrival time
We present a two-stage scheduling approach including proactive and reactive scheduling to solve the ground resource scheduling problem with uncertain arrival time. In the first stage, an integer programming model is constructed to minimize the delay and transfer costs. After solving this model, we o...
Main Authors: | Guoning Xu, Yupeng Lin, Zhiying Wu, Qingxin Chen, Ning Mao |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2023-12-01
|
Series: | Operations Research Perspectives |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S221471602300026X |
Similar Items
-
A Decision Support Framework for Aircraft Arrival Scheduling and Trajectory Optimization in Terminal Maneuvering Areas
by: Dongdong Gui, et al.
Published: (2024-05-01) -
Microscopic-Level Collaborative Optimization Framework for Integrated Arrival-Departure and Surface Operations: Integrated Runway and Taxiway Aircraft Sequencing and Scheduling
by: Chaoyu Xia, et al.
Published: (2024-12-01) -
Optimising Airport Ground Resource Allocation for Multiple Aircraft Using Machine Learning-Based Arrival Time Prediction
by: Deepudev Sahadevan, et al.
Published: (2023-05-01) -
Multi-objective optimization model of autonomous minibus considering passenger arrival reliability and travel risk
by: Zhicheng Jin, et al.
Published: (2024-12-01) -
Ferry Scheduling Optimization Considering Arrival Time Uncertainty and In-Place Time Differences
by: Guoning Xu, et al.
Published: (2023-10-01)