Research on the scheduling method of ground resource under uncertain arrival time
We present a two-stage scheduling approach including proactive and reactive scheduling to solve the ground resource scheduling problem with uncertain arrival time. In the first stage, an integer programming model is constructed to minimize the delay and transfer costs. After solving this model, we o...
Main Authors: | Guoning Xu, Yupeng Lin, Zhiying Wu, Qingxin Chen, Ning Mao |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2023-12-01
|
Series: | Operations Research Perspectives |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S221471602300026X |
Similar Items
-
Optimising Airport Ground Resource Allocation for Multiple Aircraft Using Machine Learning-Based Arrival Time Prediction
by: Deepudev Sahadevan, et al.
Published: (2023-05-01) -
Ferry Scheduling Optimization Considering Arrival Time Uncertainty and In-Place Time Differences
by: Guoning Xu, et al.
Published: (2023-10-01) -
Integrated scheduling of distributed production and distribution in group manufacturing with uncertain travel time
by: Jun Guo, et al.
Published: (2022-10-01) -
Adaptive Large Neighborhood Search to Solve Multi-Level Scheduling and Assignment Problems in Broiler Farms
by: Natthanan Praseeratasang, et al.
Published: (2019-06-01) -
Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm
by: Nuntana Mayteekrieangkrai, et al.
Published: (2015-04-01)