Power Conversion System Operation to Reduce the Electricity Purchasing Cost of Energy Storage Systems

A strategy to operate a power conversion system (PCS) to minimize the electricity rate of an energy storage system (ESS) is formulated. The ESS operation method is determined considering the power management system (PMS). The primary functions include peak-cut, peak-shifting, and frequency regulatio...

Full description

Bibliographic Details
Main Authors: Jun-Mo Kim, Jeong Lee, Jin-Wook Kim, Junsin Yi, Chung-Yuen Won
Format: Article
Language:English
Published: MDPI AG 2021-08-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/14/16/4728
_version_ 1797524053309784064
author Jun-Mo Kim
Jeong Lee
Jin-Wook Kim
Junsin Yi
Chung-Yuen Won
author_facet Jun-Mo Kim
Jeong Lee
Jin-Wook Kim
Junsin Yi
Chung-Yuen Won
author_sort Jun-Mo Kim
collection DOAJ
description A strategy to operate a power conversion system (PCS) to minimize the electricity rate of an energy storage system (ESS) is formulated. The ESS operation method is determined considering the power management system (PMS). The primary functions include peak-cut, peak-shifting, and frequency regulation typically related to electricity rates. Thus, the battery is charged and discharged when the price is low and high, respectively, thereby monetizing the battery. However, the ESS incurs a high cost for the batteries and PCS. Therefore, ESSs that reuse electric vehicle (EV) batteries are being actively developed. Many researchers have attempted to maximize the profit of ESSs by developing algorithms to calculate the optimal ESS capacity by performing a power load analysis of electricity consumers. An ESS selected based on this calculation can be operated through the PMS. This ESS can use the battery state of charge (<i>SoC</i>), ranging from 10–90%, to conduct a feasibility analysis using the net present value, which reflects the current electricity rate. This feasibility analysis is performed considering the difference between the initial investment cost of the ESS and the profit obtained from the power generation of the ESS. In South Korea, many policies have been implemented to encourage the installation of ESSs. The ESS promotion policy was implemented until 2020 to reduce the electricity rate, including the contracted capacity of batteries. However, since 2021, this policy has been transformed to reduce the electricity rate based on the daily maximum power generation. Thus, the conventional method of increasing the battery capacity is not suitable, and the profitability should be increased using limited batteries. For ESSs, PCSs composed of single and parallel structures can be used. When installing a large capacity ESS, a PCS using silicon (Si) is adopted to reduce the unit cost of the PCS. The unit price of a silicon carbide (SiC) device has recently decreased significantly. Thus, in this study, a PCS using this SiC device was developed. Moreover, an algorithm was formulated to minimize the electricity rate of the ESS, and the operation of a modular type PCS based on this algorithm was demonstrated.
first_indexed 2024-03-10T08:51:52Z
format Article
id doaj.art-99d0a6a9016940e29b4c001eb5ea2927
institution Directory Open Access Journal
issn 1996-1073
language English
last_indexed 2024-03-10T08:51:52Z
publishDate 2021-08-01
publisher MDPI AG
record_format Article
series Energies
spelling doaj.art-99d0a6a9016940e29b4c001eb5ea29272023-11-22T07:26:32ZengMDPI AGEnergies1996-10732021-08-011416472810.3390/en14164728Power Conversion System Operation to Reduce the Electricity Purchasing Cost of Energy Storage SystemsJun-Mo Kim0Jeong Lee1Jin-Wook Kim2Junsin Yi3Chung-Yuen Won4Interdisciplinary Program in Photovoltaic System Engineering, Sungkyunkwan University, Suwon 16419, KoreaDepartment of Electrical and Computer Engineering, Sungkyunkwan University, Suwon 16419, KoreaDepartment of Electrical and Computer Engineering, Sungkyunkwan University, Suwon 16419, KoreaDepartment of Electrical and Computer Engineering, Sungkyunkwan University, Suwon 16419, KoreaDepartment of Electrical and Computer Engineering, Sungkyunkwan University, Suwon 16419, KoreaA strategy to operate a power conversion system (PCS) to minimize the electricity rate of an energy storage system (ESS) is formulated. The ESS operation method is determined considering the power management system (PMS). The primary functions include peak-cut, peak-shifting, and frequency regulation typically related to electricity rates. Thus, the battery is charged and discharged when the price is low and high, respectively, thereby monetizing the battery. However, the ESS incurs a high cost for the batteries and PCS. Therefore, ESSs that reuse electric vehicle (EV) batteries are being actively developed. Many researchers have attempted to maximize the profit of ESSs by developing algorithms to calculate the optimal ESS capacity by performing a power load analysis of electricity consumers. An ESS selected based on this calculation can be operated through the PMS. This ESS can use the battery state of charge (<i>SoC</i>), ranging from 10–90%, to conduct a feasibility analysis using the net present value, which reflects the current electricity rate. This feasibility analysis is performed considering the difference between the initial investment cost of the ESS and the profit obtained from the power generation of the ESS. In South Korea, many policies have been implemented to encourage the installation of ESSs. The ESS promotion policy was implemented until 2020 to reduce the electricity rate, including the contracted capacity of batteries. However, since 2021, this policy has been transformed to reduce the electricity rate based on the daily maximum power generation. Thus, the conventional method of increasing the battery capacity is not suitable, and the profitability should be increased using limited batteries. For ESSs, PCSs composed of single and parallel structures can be used. When installing a large capacity ESS, a PCS using silicon (Si) is adopted to reduce the unit cost of the PCS. The unit price of a silicon carbide (SiC) device has recently decreased significantly. Thus, in this study, a PCS using this SiC device was developed. Moreover, an algorithm was formulated to minimize the electricity rate of the ESS, and the operation of a modular type PCS based on this algorithm was demonstrated.https://www.mdpi.com/1996-1073/14/16/4728power conversion systemenergy storage systempower management systemnet present value
spellingShingle Jun-Mo Kim
Jeong Lee
Jin-Wook Kim
Junsin Yi
Chung-Yuen Won
Power Conversion System Operation to Reduce the Electricity Purchasing Cost of Energy Storage Systems
Energies
power conversion system
energy storage system
power management system
net present value
title Power Conversion System Operation to Reduce the Electricity Purchasing Cost of Energy Storage Systems
title_full Power Conversion System Operation to Reduce the Electricity Purchasing Cost of Energy Storage Systems
title_fullStr Power Conversion System Operation to Reduce the Electricity Purchasing Cost of Energy Storage Systems
title_full_unstemmed Power Conversion System Operation to Reduce the Electricity Purchasing Cost of Energy Storage Systems
title_short Power Conversion System Operation to Reduce the Electricity Purchasing Cost of Energy Storage Systems
title_sort power conversion system operation to reduce the electricity purchasing cost of energy storage systems
topic power conversion system
energy storage system
power management system
net present value
url https://www.mdpi.com/1996-1073/14/16/4728
work_keys_str_mv AT junmokim powerconversionsystemoperationtoreducetheelectricitypurchasingcostofenergystoragesystems
AT jeonglee powerconversionsystemoperationtoreducetheelectricitypurchasingcostofenergystoragesystems
AT jinwookkim powerconversionsystemoperationtoreducetheelectricitypurchasingcostofenergystoragesystems
AT junsinyi powerconversionsystemoperationtoreducetheelectricitypurchasingcostofenergystoragesystems
AT chungyuenwon powerconversionsystemoperationtoreducetheelectricitypurchasingcostofenergystoragesystems