An exact solution for the resource-constrained construction scheduling problem
Reduced time and, by the same token, the cost of the project is a crucial factor in contemporary construction. This article presents a method for the exact optimisation of a resource-constrained scheduling problem. Based on the Critical Path Method, graph theory and linear programming, an algorithm...
Main Authors: | Bartłomiej Sroka, Elżbieta Radziszewska-Zielina |
---|---|
Format: | Article |
Language: | English |
Published: |
Vilnius Gediminas Technical University
2016-07-01
|
Series: | Engineering Structures and Technologies |
Subjects: | |
Online Access: | https://journals.vgtu.lt/index.php/EST/article/view/2514 |
Similar Items
-
A GENETIC ALGORITHM FOR THE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM (RCPSP)
by: Edgar Gutiérrez Franco, et al.
Published: (2008-01-01) -
Planning repetitive construction projects considering technological constraints
by: Radziszewska-Zielina Elżbieta, et al.
Published: (2018-12-01) -
Tracking Predictive Gantt Chart for Proactive Rescheduling in Stochastic Resource Constrained Project Scheduling
by: Mario Brčić, et al.
Published: (2018-12-01) -
Priority Scheduling in the Planning of Multiple-Structure Construction Projects
by: Radziszewska-Zielina E., et al.
Published: (2017-12-01) -
Evaluating Typical Algorithms of Combinatorial Optimization to Solve Continuous-Time Based Scheduling Problem
by: Alexander A. Lazarev, et al.
Published: (2018-04-01)