IBIS-FM radar as a tool for monitoring hill slopes during excavations in hydropower projects: A case study from Bhutan Himalayas

Excavation is common in the construction of hydropower projects. Monitoring for both stable and unstable slopes is a pressing requirement during progressive excavations with or without cut-slope support measures. The present study is about an excavation carried out in a proposed concrete gravity dam...

Full description

Bibliographic Details
Main Authors: K.R. Praveen, Jamyang Chophel, Jigme Wangchuk, Karma Tshewang, Naveen Chander Bansal
Format: Article
Language:English
Published: KeAi Communications Co., Ltd. 2022-04-01
Series:Energy Geoscience
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S2666759221000603
_version_ 1818339019084267520
author K.R. Praveen
Jamyang Chophel
Jigme Wangchuk
Karma Tshewang
Naveen Chander Bansal
author_facet K.R. Praveen
Jamyang Chophel
Jigme Wangchuk
Karma Tshewang
Naveen Chander Bansal
author_sort K.R. Praveen
collection DOAJ
description Excavation is common in the construction of hydropower projects. Monitoring for both stable and unstable slopes is a pressing requirement during progressive excavations with or without cut-slope support measures. The present study is about an excavation carried out in a proposed concrete gravity dam site on the right bank slope of the Punatsangchhu River in western Bhutan. During the excavation, the right bank abutment witnessed multiple events of slope failures of various magnitudes. One major landslide occurred on 23 July 2013 in the toe of the right abutment, where foliation/multiple sheared/fractured zones/seams in quartz-feldspathic biotite gneiss dip towards the valley. During further excavations/piling works, a subsequent landslide on the downstream, within the body of the July 2013 landslide, occurred on 12 August 2016. As a result, a real-time monitoring of the slope became necessary to facilitate further excavations for achieving the dam foundation. Thus, the advanced slope monitoring instrument like Image By Interferometric Survey – Frequency Modulated (IBIS-FM) radar was deployed for monitoring the right bank slope during the excavation for the construction of ∼129 m high dam. The displacement of the hill slope is assessed based on this system by monitoring point locations as well as areas by assigning different threshold values for providing timely alerts. This real-time monitoring was effective in identifying the reactivation of August 2016 landslide that occurred on 22 January 2019. Thus, this study showcases the efficiency of IBIS-FM radar in monitoring slope instability with sub-millimeter accuracy on a near real-time basis.
first_indexed 2024-12-13T15:20:21Z
format Article
id doaj.art-9abaeb3f22644f279ff126c18fec2a42
institution Directory Open Access Journal
issn 2666-7592
language English
last_indexed 2024-12-13T15:20:21Z
publishDate 2022-04-01
publisher KeAi Communications Co., Ltd.
record_format Article
series Energy Geoscience
spelling doaj.art-9abaeb3f22644f279ff126c18fec2a422022-12-21T23:40:35ZengKeAi Communications Co., Ltd.Energy Geoscience2666-75922022-04-0132211217IBIS-FM radar as a tool for monitoring hill slopes during excavations in hydropower projects: A case study from Bhutan HimalayasK.R. Praveen0Jamyang Chophel1Jigme Wangchuk2Karma Tshewang3Naveen Chander Bansal4Corresponding author.; Punatsangchhu-I Hydroelectric Project, Wangdue Phodrang, BhutanPunatsangchhu-I Hydroelectric Project, Wangdue Phodrang, BhutanPunatsangchhu-I Hydroelectric Project, Wangdue Phodrang, BhutanPunatsangchhu-I Hydroelectric Project, Wangdue Phodrang, BhutanPunatsangchhu-I Hydroelectric Project, Wangdue Phodrang, BhutanExcavation is common in the construction of hydropower projects. Monitoring for both stable and unstable slopes is a pressing requirement during progressive excavations with or without cut-slope support measures. The present study is about an excavation carried out in a proposed concrete gravity dam site on the right bank slope of the Punatsangchhu River in western Bhutan. During the excavation, the right bank abutment witnessed multiple events of slope failures of various magnitudes. One major landslide occurred on 23 July 2013 in the toe of the right abutment, where foliation/multiple sheared/fractured zones/seams in quartz-feldspathic biotite gneiss dip towards the valley. During further excavations/piling works, a subsequent landslide on the downstream, within the body of the July 2013 landslide, occurred on 12 August 2016. As a result, a real-time monitoring of the slope became necessary to facilitate further excavations for achieving the dam foundation. Thus, the advanced slope monitoring instrument like Image By Interferometric Survey – Frequency Modulated (IBIS-FM) radar was deployed for monitoring the right bank slope during the excavation for the construction of ∼129 m high dam. The displacement of the hill slope is assessed based on this system by monitoring point locations as well as areas by assigning different threshold values for providing timely alerts. This real-time monitoring was effective in identifying the reactivation of August 2016 landslide that occurred on 22 January 2019. Thus, this study showcases the efficiency of IBIS-FM radar in monitoring slope instability with sub-millimeter accuracy on a near real-time basis.http://www.sciencedirect.com/science/article/pii/S2666759221000603IBIS-FM radarGB-InSARExcavationsReal-time monitoringSlope instabilityLandslide
spellingShingle K.R. Praveen
Jamyang Chophel
Jigme Wangchuk
Karma Tshewang
Naveen Chander Bansal
IBIS-FM radar as a tool for monitoring hill slopes during excavations in hydropower projects: A case study from Bhutan Himalayas
Energy Geoscience
IBIS-FM radar
GB-InSAR
Excavations
Real-time monitoring
Slope instability
Landslide
title IBIS-FM radar as a tool for monitoring hill slopes during excavations in hydropower projects: A case study from Bhutan Himalayas
title_full IBIS-FM radar as a tool for monitoring hill slopes during excavations in hydropower projects: A case study from Bhutan Himalayas
title_fullStr IBIS-FM radar as a tool for monitoring hill slopes during excavations in hydropower projects: A case study from Bhutan Himalayas
title_full_unstemmed IBIS-FM radar as a tool for monitoring hill slopes during excavations in hydropower projects: A case study from Bhutan Himalayas
title_short IBIS-FM radar as a tool for monitoring hill slopes during excavations in hydropower projects: A case study from Bhutan Himalayas
title_sort ibis fm radar as a tool for monitoring hill slopes during excavations in hydropower projects a case study from bhutan himalayas
topic IBIS-FM radar
GB-InSAR
Excavations
Real-time monitoring
Slope instability
Landslide
url http://www.sciencedirect.com/science/article/pii/S2666759221000603
work_keys_str_mv AT krpraveen ibisfmradarasatoolformonitoringhillslopesduringexcavationsinhydropowerprojectsacasestudyfrombhutanhimalayas
AT jamyangchophel ibisfmradarasatoolformonitoringhillslopesduringexcavationsinhydropowerprojectsacasestudyfrombhutanhimalayas
AT jigmewangchuk ibisfmradarasatoolformonitoringhillslopesduringexcavationsinhydropowerprojectsacasestudyfrombhutanhimalayas
AT karmatshewang ibisfmradarasatoolformonitoringhillslopesduringexcavationsinhydropowerprojectsacasestudyfrombhutanhimalayas
AT naveenchanderbansal ibisfmradarasatoolformonitoringhillslopesduringexcavationsinhydropowerprojectsacasestudyfrombhutanhimalayas