Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers...
Main Authors: | Javad Hasanpour, Mohammad Ghodoosi, Zahra Sadat Hosseini |
---|---|
Format: | Article |
Language: | English |
Published: |
Islamic Azad University, Qazvin Branch
2016-12-01
|
Series: | Journal of Optimization in Industrial Engineering |
Subjects: | |
Online Access: | http://www.qjie.ir/article_263_df1598cc2762beba0b7ea8a8063beb4a.pdf |
Similar Items
-
Solving Restricted Preemptive Scheduling on Parallel Machines with SAT and PMS
by: Xiaojuan Liao, et al.
Published: (2023-08-01) -
An LP-Based Algorithm for Scheduling Preemptive and/or Non-Preemptive Real-Time Tasks
by: Hideki HASHIMOTO, et al.
Published: (2010-06-01) -
Minimizing Total Completion Time For Preemptive Scheduling With Release Dates And Deadline Constraints
by: He Cheng, et al.
Published: (2014-02-01) -
Preemptive Zone Reset Design within Zoned Namespace SSD Firmware
by: Siu Jung, et al.
Published: (2023-02-01) -
TIGHT-TARDY PROGRESSIVE IDLING-FREE 1-MACHINE PREEMPTIVE SCHEDULING WITH JOB PRIORITY WEIGHTS BY HEURISTIC’S EFFICIENT JOB ORDER INPUT
by: Vadim V. Romanuke
Published: (2021-03-01)