Energy and Exergy Analysis of Steam Power Plant 3rd Unit PT PLN (PERSERO) Centre Unit Generation Tanjung Jati B Use BFP-T Modification Cycle
Steam power plant Generation of Tanjung Jati B 3rd unit has a capacity of 660 MW. The power plant operational in 2011, because of the long operation process, there will be a decrease in performance. The plant needs to be researched to analyze the performance and losses that occurs in the power plant...
Main Authors: | U MSK. Tony Suryo, Yohana Eflita, Priyanto Syarif Dwi, M. Ignatius Apryando, Tauviqirrahman |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2019-01-01
|
Series: | E3S Web of Conferences |
Subjects: | |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/51/e3sconf_icenis2019_13003.pdf |
Similar Items
-
EXERGY PINCH ANALYSIS OF ALL ELEMENTS OF THE BOILER UNIT AND THE BOILER UNIT AS A WHOLE
by: Vladimir A. Lebedev, et al.
Published: (2020-08-01) -
Exergy Analysis of an Air Dehumidification System Equipped with Mixing Box and Heat Exchanger Heat Recovery Units
by: Tohid Jafarinejad, et al.
Published: (2019-08-01) -
Cooling Load and Exergy Destruction Analysis in Air Conditioning Operation Room with Ambient Temperature Variation
by: Yohana Eflita, et al.
Published: (2018-01-01) -
Exergy analysis of an industrial oven /
by: Chai, Chuan Hao, 1989-, et al.
Published: (2012) -
Exergy analysis of a solar air heater /
by: Nurul Shahira Mohd. Kassim, 1988-, et al.
Published: (2011)